FSRU Ravenna Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

FSRU Ravenna Gas Pipeline is an operating gas/hydrogen pipeline in Italy.[1]

Location

The pipeline is proposed to run from Ravenna, offshore to the nearby FSRU.[2]


Project details

  • Operator: Snam[1]
  • Owner: [3]
  • Parent company:
  • Capacity: 220 GWh/d[1]
  • Length: 41km[4]
  • Diameter:
  • Status: Operating[5]
  • Start year: 2025[5]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Corinth Pipeworks was contracted to provide the pipes for the offshore section of the pipeline, with the company claiming the pipelines can transport up to a 100% hydrogen.[6] The route from the project is derived from the H2inframap, which displays a collection of hydrogen-related projects across Europe.[3]

The pipeline was initially due to be completed in 2024, however, commissiong was in April 2025.[2]

Articles and resources

References

  1. 1.0 1.1 1.2 "Ten Year Network Development Plan". ENTSOG. Retrieved 2025-08-26.
  2. 2.0 2.1 "BW Singapore FSRU completes commissioning – Commercial operations in May". Snam. 2025. Retrieved 2025-08-28.
  3. 3.0 3.1 "H2 Infrastructure Map Europe". www.h2inframap.eu. Retrieved 2024-08-15.
  4. "TYNDP | ENTSOG". www.entsog.eu. Retrieved 2024-09-30.
  5. 5.0 5.1 "Ravenna FSRU terminal prepares for commercial ops". LinkedIn. Retrieved 2025-08-28.
  6. Habibic, Ajsa (2023-09-26). "Snam hires Greek firm for pipeline works on new FSRU project off Ravenna". Offshore Energy. Retrieved 2024-09-30.