Fibria MS-II power station

From Global Energy Monitor
This article is part of the
Global Bioenergy Power Tracker, a Global Energy Monitor project.
Report an error

Fibria MS-II power station (Usina de biomassa Fibria MS-II) is an operating bioenergy power station in Três Lagoas, Mato Grosso do Sul, Brazil.

Project Details

Table 1: Unit-level project details for Fibria MS-II power station

Unit name Status Capacity (MW) Commissioning year Fuel sources Owner Operator
Tg3 Operating[1] 149 MW[1][2][3][4] 2017[1][4] Paper mill wastes[1] Suzano SA[1][5] Suzano SA[1]
Tg4 Operating[1] 126 MW[1][2][3][4] 2017[1][4] Paper mill wastes[1] Suzano SA[1][5] Suzano SA[1]

Location

Table 2: Unit-level location details for Fibria MS-II power station

Unit name Location Coordinates (WGS 84)
Tg3 Três Lagoas, Mato Grosso do Sul, Brazil[1] -20.9961, -51.7961 (exact)[1]
Tg4 Três Lagoas, Mato Grosso do Sul, Brazil[1] -20.9961, -51.7961 (exact)[1]

The map below shows the exact location of the power station units:

Loading map...


Background

Articles and Resources

Additional Resources

To access additional data, including an interactive map of global bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 https://dados.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel. Archived from the original on September 10, 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) http://www.revistaopapel.org.br/noticia-anexos/1621787746_bc460e33ec8633764cd81c1960336d29_124360099.pdf. Archived (PDF) from the original on September 10, 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://issuu.com/revistaoempreiteiro1/docs/revistaoe562_v2b_5set. Archived from the original on September 10, 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://www.canalenergia.com.br/noticias/53031155/termeletrica-de-269-mw-da-fibria-e-liberada-para-operacao-em-teste. Archived from the original on September 10, 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://r2020.suzano.com.br/wp-content/uploads/2021/05/RelatorioSuzano2020.pdf. Archived (PDF) from the original on September 10, 2022. {{cite web}}: Missing or empty |title= (help)