Fighting Jays Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Fighting Jays Solar Project is an operating solar photovoltaic (PV) farm in Needville, Fort Bend County, Texas, United States.
Project Details
Table 1: Phase-level project details for Fighting Jays Solar Project
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2022[1] | 228 MWac[1] | PV[2] | Copenhagen Infrastructure Partners (CIP)[3] | Miller Bros[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Fighting Jays Solar Project
Location | Coordinates (WGS 84) |
---|---|
Needville, Fort Bend County, Texas, United States[1] | 29.3450, -95.7280 (exact)[5] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ https://cipartners.dk/2020/03/20/cip-acquires-fighting-jays-a-440-mwdc-solar-pv-project-in-fort-bend-county-texas/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://web.archive.org/web/20220228165257/https://cisc.dk/assets/fighting-jays/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ WKSL2023