Fighting Jays Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Fighting Jays Solar Project is an operating solar photovoltaic (PV) farm in Needville, Fort Bend County, Texas, United States.

Project Details

Table 1: Phase-level project details for Fighting Jays Solar Project

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2022[1] 228 MWac[1] PV[2] Copenhagen Infrastructure Partners (CIP)[3] Miller Bros[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Fighting Jays Solar Project

Location Coordinates (WGS 84)
Needville, Fort Bend County, Texas, United States[1] 29.3450, -95.7280 (exact)[5]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.{{cite web}}: CS1 maint: url-status (link)
  2. "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. https://cipartners.dk/2020/03/20/cip-acquires-fighting-jays-a-440-mwdc-solar-pv-project-in-fort-bend-county-texas/. {{cite web}}: Missing or empty |title= (help)
  4. http://web.archive.org/web/20220228165257/https://cisc.dk/assets/fighting-jays/. {{cite web}}: Missing or empty |title= (help)
  5. WKSL2023