Filipinas LNG Gateway Project FSRU
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Filipinas LNG Gateway Project FSRU, also known as Luzon LNG Terminal, is an in-construction LNG import terminal in Philippines.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Filipinas LNG Gateway Project FSRU | Batangas, Philippines[1] | 13.726365, 120.99401 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Filipinas LNG Gateway Project FSRU | import[1] | construction[2] | 4.4 mtpa[3] | 4.4 mtpa | True | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Filipinas LNG Gateway Project FSRU | import[1] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Filipinas LNG Gateway Project FSRU | import[1] | construction[2] | – | – | 2025[2] | 2028[4][2] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Filipinas LNG Gateway Project FSRU | import[1] | construction[2] | Luzon LNG Terminal Inc [100%][1] | Excelerate Energy Inc [24.3%]; Excelerate Energy Holdings LLC | Luzon LNG Terminal[4] |
Background
In April 2021 Excelerate applied to the Philippine Department of Energy (DOE) to begin construction of the terminal.[5]
The project is included in the list of approved projects by the Department of Energy as of April 27, 2023.[6]
The 2024 IGU report, released in June 2024, stated that the terminal was under construction.[7]
The 2025 IGU report, released in May 2025, still stated that the terminal was under construction, although its start year had been shifted from 2025 as to 2028.[8] As of 2026, no project activity has been reported since Excelerate's PCERM application in April 2021, and there is no evidence that construction has begun. Given more than two years without developments, the project is classified as shelved.[9]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.gmanetwork.com/news/money/companies/761722/us-firm-excelerate-to-build-phl-s-first-open-access-lng-terminal-in-batangas/story/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 (PDF) https://www.datocms-assets.com/146580/1747916410-igu-world-lng-report-2025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.datocms-assets.com/146580/1736938573-2024-world-lng-report.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://tanknewsinternational.com/excelerate-prepares-to-start-work-on-new-open-access-batangas-lng-terminal/.
{{cite web}}: Missing or empty|title=(help) - ↑ Texas-based firm seeks DOE nod to start LNG hub project, Manila Standard, Apr. 21, 2021
- ↑ Department of Energy (2023-04-27). "Energy Sector Updates" (PDF). doe.gov.ph.
{{cite web}}: CS1 maint: url-status (link) - ↑ IGU. 2024 World LNG Report. June 2024.
- ↑ https://www.datocms-assets.com/146580/1749457104-igu-world-lng-report-2025-hr_dp.pdf
- ↑ "US firm to seek permit to build offshore Batangas LNG terminal 'soon' - BusinessWorld Online". bworldonline.com. Retrieved 2026-07-11.