Finsterwalde Solarpark

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Solar Schipkau Ii Gmbh & Co. Kg, SILVINO GmbH & Co. KG, Solar Schipkau Gmbh, MITAB GmbH & Co. KG, Solar Schipkau Gmbh & Co. Kg

Finsterwalde Solarpark is an operating solar photovoltaic (PV) farm in Finsterwalde, Elbe-Elster, Brandenburg, Germany.

Project Details

Table 1: Phase-level project details for Finsterwalde Solarpark

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1900-01-02 00:00:00 Operating[1] 2010[1] 20 MWp/dc[2][1] PV[3] DIF Capital Partners; NIBC European Infrastructure Fund[1] Hanwha Q Cells[1]
1900-01-03 00:00:00 Operating[1] 2010[1] 20 MWp/dc[2][1] PV[3] DIF Capital Partners; NIBC European Infrastructure Fund[1] Hanwha Q Cells[1]
1a Operating[4] 2009[4] 22 MWp/dc[4] PV[4] LHI PV MITAB 1785 GMBH & CO KG[4]
1b Operating[4] 2009[4] 20 MWp/dc[4] PV[4] LHI PV MITAB 1785 GMBH & CO KG[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Finsterwalde Solarpark

Phase Name Location Coordinates (WGS 84)
1900-01-02 00:00:00 Finsterwalde, Elbe-Elster, Brandenburg, Germany[5] 51.6315, 13.7074 (exact)[5]
1900-01-03 00:00:00 Finsterwalde, Elbe-Elster, Brandenburg, Germany[5] 51.6315, 13.7074 (exact)[5]
1a Lichterfeld-Schacksdorf, Elbe-Elster, Brandenburg, Germany[4] 51.5701, 13.7501 (exact)[4]
1b Finsterwalde, Elbe-Elster, Brandenburg, Germany[4] 51.5656, 13.7282 (exact)[4]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://www.pv-tech.org/q_cells_closes_sale_of_40mw_pv_projects_to_difnibc_joint_venture_blue_forre/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20100911055545/http://www.u-energy.de/download/2010_06_18_realisierung_solarpark_finsterwalde_2_und_3_eng.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.solarfeeds.com/mag/largest-solar-power-plants-in-germany/. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 "Aktuelle Einheitenübersicht". MaStR marktstammdatenregister. September 23, 2021. Archived from the original on September 21, 2021. Retrieved October 4, 2021.
  5. 5.0 5.1 5.2 5.3 Germany Federal Network Agency (February 2023). "Marktstammdatenregister (Market master data register)". Marktstammdatenregister (Market master data register). Archived from the original on January 23, 2023. Retrieved February 2023. {{cite web}}: Check date values in: |access-date= (help)