Fish Springs Ranch solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Fish Springs Ranch solar farm is an operating solar photovoltaic (PV) farm in Reno, Washoe County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Fish Springs Ranch solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 100 MWac[1] | PV[1] | NextEra Energy Inc [100%][2] | NextEra Energy[1] |
2 | Shelved (inferred July 2024) | – | 200 MW[3] | PV[3] | NextEra Energy Inc [100%][3] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Fish Springs Ranch solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Reno, Washoe County, Nevada, United States[1] | 40.0747, -119.9742 (exact)[1] |
2 | Washoe County, Nevada, United States[3] | 40.1041, -119.8883 (approximate)[3] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20240206194714/https://www.nvenergy.com/cleanenergy/renewable-energy-portfolio/solar-resources. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 (PDF) https://web.archive.org/web/20240201183901/https://www.washoecounty.gov/csd/planning_and_development/board_commission/planning_commission/2020/Files/2020-03-03/WSUP20-0001%20Fish%20Springs%20Solar%20-%20Applicant%20Presentation.pdf. Archived from the original (PDF) on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)