Forêt Domaniale wind farm is a wind farm in pre-construction in Canada.

Project Details

Table 1: Phase-level project details for Forêt Domaniale wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Pre-construction[1] 2026 (planned)[1] 180 MW[1] Onshore[1] EDF Renewables[1]
2 Announced[2] 2027 (planned)[2] 100 MW[2] Onshore[2] EDF Renewables[2]

Location

Table 2: Phase-level location details for Forêt Domaniale wind farm

Phase Name Location Coordinates (WGS 84)
1 Canada 46.893278, -70.337918 (approximate)[1]
2 Canada 46.893278, -70.337918 (approximate)[2][1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.edf-re.com/project/foret_domaniale_wind/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://www.edf-re.com/project/foret-domaniale-2-wind-project/. {{cite web}}: Missing or empty |title= (help)