Forest Grove - Dodd solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Forest Grove - Dodd solar farm is an announced solar farm in Athens, Henderson County, Texas, United States.
Project Details
Table 1: Phase-level project details for Forest Grove - Dodd solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1a | Announced[1] | 2022 (planned)[1] | 200 MWac[2] | PV[1] | Vistra CORP[3] | Renewable Energy Ventures LLC[1] |
1b | Announced[1] | 2022 (planned)[1] | 200 MWac[2] | PV[1] | Vistra CORP[3] | Renewable Energy Ventures LLC[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Forest Grove - Dodd solar farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1a | Athens, Henderson County, Texas, United States[1] | 32.2515, -95.9568 (approximate)[1] |
1b | Athens, Henderson County, Texas, United States[1] | 32.2515, -95.9568 (approximate)[1] |
The map below shows the approximate location of the solar farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.
- ↑ 2.0 2.1 Holl, Blake. "Two Solar Farms Set To Be Constructed In East Texas". Kltv. Archived from the original on February 7, 2022. Retrieved February 14, 2022.
- ↑ 3.0 3.1 "Vistra Breaks Ground On 1,000 Mw Of Solar, Storage In Texas". Renewables Now. Archived from the original on October 1, 2020. Retrieved February 14, 2022.