Formosa 4 offshore wind farm is a wind farm in pre-construction near Miaoli County, Taiwan.


Project Details

Table 1: Phase-level project details for Formosa 4 offshore wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner
1 Pre-construction[1] 2025 (planned)[2] 1728 MW[1] Offshore hard mount Swancor Renewable Energy; other[2]
2 Announced[2] 2025 (planned)[2] 1360 MW[3] Offshore hard mount Swancor Renewable Energy[2]


Location

Table 2: Phase-level location details for Formosa 4 offshore wind farm

Phase name Location Coordinates (WGS 84)
1 Miaoli County, Taiwan[2] 24.7861, 120.3589 (approximate)[2]
2 Miaoli County, Taiwan[2] 24.7861, 120.3589 (approximate)[2]

The map below shows the approximate location of the wind farm phases:

Loading map...


Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.4coffshore.com/windfarms/taiwan/hai-sheng---formosa-4-taiwan-tw87.html. Archived from the original on August 19, 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "Formosa 4 Offshore Wind Farm – Swancor Renewable Energy". Archived from the original on January 26, 2021. Retrieved August 24, 2021.
  3. https://www.4coffshore.com/windfarms/taiwan/hai-feng---formosa-iv-1-taiwan-tw85.html. Archived from the original on August 16, 2022. {{cite web}}: Missing or empty |title= (help)