Fort Huachuca Solar PV Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Fort Huachuca Solar PV Project FHUA2 (Phase A2), Fort Huachuca Solar PV Project FHUAC (Phase AC)
Fort Huachuca Solar PV Project is an operating solar photovoltaic (PV) farm in Cochise County, Arizona, United States.
Project Details
Table 1: Phase-level project details for Fort Huachuca Solar PV Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|
A2 | Operating[1] | 2017[1] | 4.1 MWac[1] | PV[1] | Tucson Electric Power[1] |
AC | Operating[1] | 2014[1] | 13.6 MWac[1] | PV[1] | Tucson Electric Power[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Fort Huachuca Solar PV Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
A2 | Cochise County, Arizona, United States[1] | 31.5553, -110.3501 (exact)[1] |
AC | Cochise County, Arizona, United States[1] | 31.5553, -110.3501 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help)