Fortescue Pilbara iron ore mine wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Marble Bar wind farm, Iron Bridge iron ore mine wind farm
Fortescue Pilbara iron ore mine wind farm is a wind farm in pre-construction in Western Australia, Australia.
Project Details
Table 1: Phase-level project details for Fortescue Pilbara iron ore mine wind farm
| Status | Commissioning year | Nameplate capacity | Type | Owner |
|---|---|---|---|---|
| Pre-construction[1] | 2029 (planned)[1] | 2100 MW[1] | Onshore[1] | Pilbara Energy Generation PTY LTD (PEG)[2] |
Location
Table 2: Phase-level location details for Fortescue Pilbara iron ore mine wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Western Australia, Australia[1] | -21.2476, 118.8673 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://reneweconomy.com.au/fortescue-lays-out-plans-for-biggest-wind-farm-in-australia-to-help-eliminate-fossil-fuels-at-giant-mines/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.epa.wa.gov.au/proposals/east-pilbara-generation-hub.
{{cite web}}: Missing or empty|title=(help)
