Forthwind Offshore Wind Demonstration Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: ForthWind Offshore Wind Demonstration Project - phase 2 Floating Wind Farm (Phase 2), Methil Offshore wind farm (Phase 1), ForthWind Offshore Wind Demonstration Project - phase 1 Floating Wind Farm (Phase 1)

Forthwind Offshore Wind Demonstration Project is a wind farm in pre-construction in Wales, United Kingdom.

Project Details

Table 1: Phase-level project details for Forthwind Offshore Wind Demonstration Project

Phase name Status Nameplate capacity Type Owner
1 Pre-construction[1] 20 MW[1] Offshore hard mount[1] Cierco [100%][2]
2 Pre-construction[3] 100 MW[3] Offshore hard mount[4] Cierco [100%][4]

Location

Table 2: Phase-level location details for Forthwind Offshore Wind Demonstration Project

Phase Name Location Coordinates (WGS 84)
1 Wales, United Kingdom[3] 51.6090, -4.9365 (approximate)[3]
2 Wales, United Kingdom[3] 51.6090, -4.9365 (approximate)[3]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240126061720/https://www.4coffshore.com/windfarms/united-kingdom/forthwind-offshore-wind-demonstration-project---phase-1-united-kingdom-uk65.html. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://web.archive.org/web/20240131163504/http://ciercoenergy.com/projects/. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27. {{cite web}}: Check date values in: |date= (help)
  4. ↑ 4.0 4.1 https://web.archive.org/web/20240126061618/https://www.4coffshore.com/windfarms/united-kingdom/forthwind-offshore-wind-demonstration-project---phase-2-united-kingdom-uk2y.html. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)