Forty Mile wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Forty Mile wind farm is an operating wind farm in Forty Mile County No. 9, Alberta, Canada.

Project Details

Table 1: Phase-level project details for Forty Mile wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
Bow Island Operating[1] 2024[1] 280 MW[2] Onshore[3] Acciona Energía SAU[4] Renewable Energy Systems (RES)[5]
Granlea Operating[6] 2022[6] 202 MW[6] Onshore[3] ATCO Power Canada Ltd[6] Renewable Energy Systems (RES)[5]

Location

Table 2: Phase-level location details for Forty Mile wind farm

Phase Name Location Coordinates (WGS 84)
Bow Island Forty Mile County No. 9, Alberta, Canada[3] 49.6431, -111.3485 (exact)[3]
Granlea Forty Mile County No. 8, Alberta, Canada[3] 49.7307, -111.2945 (exact)[3]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://renewablesassociation.ca/wp-content/uploads/2025/01/New-Project-List.pdf. {{cite web}}: Missing or empty |title= (help)
  2. https://www.acciona.com/updates/news/forty-mile-wind-farm-powers-up-clean-electricity-alberta. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240126075928/https://majorprojects.alberta.ca/details/Forty-Mile-Wind-Project-RESC/10843. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. "RES COMPLETES SALE OF ALBERTA PROJECT TO ACCIONA ENERGÍA". RES. 2023-08-31. Archived from the original on 2024-06-11. Retrieved 2024-06-10.
  5. 5.0 5.1 https://web.archive.org/web/20240130225916/http://www.fortymilewind.com/about-the-project/. Archived from the original on 2024-01-30. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://www.atco.com/en-ca/about-us/projects/phase-1-forty-mile-wind.html. {{cite web}}: Missing or empty |title= (help)