Fu County power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Fu County power station (延长石油富县电厂) is an operating power station of at least 2000-megawatts (MW) in Zhangcunyi Town, Fu, Yan'an, Shaanxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Fu County power station | Zhangcunyi Town, Fu, Yan'an, Shaanxi, China | 35.858656, 109.2167 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 35.858656, 109.2167
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[2] | 1000 | ultra-supercritical | 2023 | False |
| Phase I Unit 2 | Operating | coal: unknown[2] | 1000 | ultra-supercritical | 2023 | False |
| Phase II Unit 3 | Construction[3] | coal: unknown[2][4] | 1000[1] | ultra-supercritical[1] | 2025 (planned)[4] | False |
| Phase II Unit 4 | Construction[3] | coal: unknown[2][4] | 1000[1] | ultra-supercritical[1] | 2025 (planned)[4] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Shaanxi Yanchang Petroleum Fuxian Power Generation Co Ltd [100%] | Shaanxi Yanchang Petroleum (Group) Co Ltd [85.5%]; Chang'an Huitong Co Ltd [10.0%]; unknown [4.5%] |
| Phase I Unit 2 | Shaanxi Yanchang Petroleum Fuxian Power Generation Co Ltd [100%] | Shaanxi Yanchang Petroleum (Group) Co Ltd [85.5%]; Chang'an Huitong Co Ltd [10.0%]; unknown [4.5%] |
| Phase II Unit 3 | Shaanxi Yanchang Petroleum Fuxian Power Generation Co Ltd [100%] | Shaanxi Yanchang Petroleum (Group) Co Ltd [85.5%]; Chang'an Huitong Co Ltd [10.0%]; unknown [4.5%] |
| Phase II Unit 4 | Shaanxi Yanchang Petroleum Fuxian Power Generation Co Ltd [100%] | Shaanxi Yanchang Petroleum (Group) Co Ltd [85.5%]; Chang'an Huitong Co Ltd [10.0%]; unknown [4.5%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 陕发改能电力[2023]1627 号[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
Shaanxi Yanchang Petroleum Group has proposed a 2 x 1,000 MW ultra-supercritical coal plant in Fu County. The project was permitted by the Shaanxi Provincial Development and Reform Commission in June 2017.[5]
The pre-feasibility study was released in January 2019.[6] The EIA report of the plant was approved by the Shaanxi Provincial Environmental Protection Bureau in April 2019. The project description states it will support a transmission line from Shaanxi to Hubei. It is waiting for the permit for construction from Shaanxi Provincial Development and Reform Commission.[7]
The project was permitted in March 2020.[8]
Construction began in September 2020.[9] In November 2022, the power station was expected to begin operation in May 2023.[10]
In May 2023, Unit 1 was reportedly connected to the grid and operation was stabilized.[11]
In June 2023, Unit 2 was connected to the grid.[12] News reports announced that Unit 2 successfully completed its 168-hour trial in early July 2023.[13][14] At the time, reports suggested that the expansion Phase II would continue in development.[13][14]
Expansion: Phase II
In March 2019, a 2 x 1000 MW expansion of the power station was listed as a 2019 key project for Shannxi province.[15]
As of June 2022, the first phase was under construction and the second phase did not appear to be on the agenda. Phase two was presumed shelved.
However, in April 2023, Phase II was awaiting its Environmental Impact Assessment (EIA) for the two 1,000 MW ultra-supercritical expansion units.[16]
In July 2023, reports indicated that Phase II was still part of the project's planned capacity and expected to complete construction by 2025.[13][14]
The project was approved in September 2023[17], and a construction ceremony was held in December 2023[18]. The EIA report was approved in December 2023[19].
The preliminary design contract was awarded in January 2024[20], which was reviewed in March 2024[21]. EPC contract bidding and awards occurred in July 2024[22][23]. A desulfurization island contract was awarded in September 2024[24]. A construction plan review was held in December 2024[25]. Construction was confirmed to have started in the second half of 2024 based on satellite imagery[26].
The first boiler steel frame for Unit 3 was erected in March 2025[27]. The main plant structure was completed in August 2025[28], the chimney was topped in September 2025[29], and the boiler header was lifted in November 2025[30].
The generator stator was positioned in May 2026[31], and the Unit 3 achieved successful power transmission in July 2026[32].
Unit 4's first boiler steel frame was erected in April 2025[33], the cooling tower was topped in October 2025[34], the boiler header was lifted in December 2025[35], and the generator stator was positioned in June 2026[36].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "陕西2×1000MW燃煤机组三大主机预中标". 电力项目圈. 2023-12-05. Archived from the original on 2026-05-14. Retrieved 2025-09-01.
- ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 "富县电厂二期2×1000兆瓦工程3号锅炉钢架吊装". 北极星火力发电网. 2025-04-07. Archived from the original on 2026-05-14. Retrieved 2025-9-1.
{{cite web}}: Check date values in:|access-date=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 (PDF) http://www.fuxian.gov.cn/upload/fuxian/2023/11/30/202311301014425492.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "核准|富县电厂2×1000MW工程获陕西省发改委批复" 国际电力网, 2017/7/7
- ↑ "公司要闻│公司中标陕西延长石油富县电厂2×1000MW高效超超临界锅炉设备项目," Sohu, 2018-01-05
- ↑ "陕西延长石油富县电厂2×1000MW工程环评报告获批," 北极星电力网, 2019/4/2
- ↑ "陕北至湖北特高压配套4个大型火电项目已获核准 2个项目计划今年开工," 北极星电力网新闻中心, 2020/3/13
- ↑ "2×1000MW!陕西延长石油富县电厂项目开工," 北极星电力网新闻中心, 2020/9/1
- ↑ 延长石油富县电厂项目:落实“西电东送”战略, Shaanxi Daily, 2022-11-03
- ↑ 2×1000MW!陕西延长石油富县电厂1号机组首次并网, BJX, 2023-05-08
- ↑ 2×1000MW!陕西延长石油富县项目2号机组首次并网一次成功, BJX, 2023-06-26
- ↑ 13.0 13.1 13.2 投资约86亿!延安首个百万千瓦级绿色燃煤电厂双机投产, BJX, 2023-07-11
- ↑ 14.0 14.1 14.2 【项目】火电|2×1000MW!延长石油富县电厂机组全面投产发电!/三项“世界首例”!赋能国内最大煤电一体化企业建设, MP Weixin, 2023-07-11
- ↑ "2019年陕西省级重点建设项目名单出炉," Sohu, 2019-03-19
- ↑ 富县电厂一期即将投产 二期规划2×1000MW空冷燃煤机组, MP Weixin, 2023-04-20
- ↑ "陕西延长石油富县电厂二期2×1000MW工程三大主机预中标". WeChat. 2023-12-05. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "延长石油富县电厂二期2×1000MW工程正式开工建设". BJX. 2023-12-27. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "关于陕西延长石油富县电厂二期2×1000MW工程环境影响报告书的批复". 陕西省生态环境厅. 2023-12-29. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕西延长石油富县电厂二期2×1000MW工程初步设计中标结果公示". WeChat. 2024-01-09. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕西延长石油富县发电公司二期2×1000MW扩建工程初步设计顺利通过评审". BJX. 2024-03-18. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕西延长石油富县电厂二期2×1000MW工程EPC总承包项目中标候选人公示". WeChat. 2024-07-22. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "延长石油富县电厂二期2×1000MW工程EPC总承包中标候选人公示". BJX. 2024-07-18. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "永清环保:1.53亿元中标延长石油2x1000MW工程脱硫岛设备项目". BJX. 2024-09-12. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "富县电厂二期2×1000MW工程施工组织总设计评审会在西安召开". BJX. 2025-01-08. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中标富县电厂二期2×1000兆瓦EPC建筑安装工程4标段". BJX. 2025-02-14. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建西北院总承包的陕西延长石油富县电厂二期2×1000兆瓦工程3号机组锅炉首根钢架完成吊装". BJX. 2025-04-07. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "富县电厂二期工程主厂房结构顺利到顶". WeChat. 2025-08-08. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "富县电厂二期工程项目烟囱顺利到顶". WeChat. 2025-09-20. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "延长石油富县电厂二期2×1000MW机组工程3号锅炉首根大板梁顺利吊装". WeChat. 2025-11-01. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "富县发电公司二期2×1000兆瓦超超临界燃煤机组项目#3机组发电机外定子精准平稳吊装就位". WeChat. 2026-05-20. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕西延长石油富县电厂二期2×1000MW煤电项目3号机组倒送电一次成功". WeChat. 2026-07-08. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕西延长石油富县电厂二期2×1000兆瓦燃煤机组工程4号锅炉首根钢架顺利吊装". WeChat. 2025-04-30. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "富县电厂二期2×1000兆瓦机组工程项目4号间冷塔顺利到顶". WeChat. 2025-10-25. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "延长石油富县电厂二期工程项目4号机组锅炉大板梁顺利吊装". WeChat. 2025-12-19. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "延长石油富县电厂二期工程项目4号机组发电机定子顺利吊装就位". WeChat. 2026-06-18. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.