Fuding Cogen power station (福能龙安热电公司福鼎热电厂) is an operating power station of at least 45-megawatts (MW) in Long'an District, Fuding, Ningde, Fujian, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Fuding Cogen power station | Long'an District, Fuding, Ningde, Fujian, China | 27.176559, 120.374441 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 3: 27.176559, 120.374441
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 3 | Operating[2][3] | coal: unknown[4][1] | 45[1] | subcritical[1] | yes[1] | 2024[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 3 | Fujian Funeng Long'an Thermal Power Co Ltd [100%][1] | Fujian Funeng Co Ltd [65.0%]; Shaanxi Coal and Chemical Industry Co Ltd [19.1%]; Haibang Chuangzhi Carbon Zhonghe (Zaozhuang) Equity Investment Partnership LP [8.9%]; Shaanxi Yijie Clean Energy Co Ltd [4.5%]; unknown [2.5%] |
Project-level coal details
- Coal source(s): domestic/imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
In 2016, a low-capacity power unit (below 30 MW) began operating at the power station in Fujian Province, China.[5] An additional 45 MW power station was proposed to be built at the same location by the Fujian Funeng Long'an Cogen Power Company.[6]
The project was listed on a provincial key projects list in 2023[7]. The boiler hydrostatic test was completed successfully[8]. The chimney top for the desulfurization tower was positioned in September 2023[9]. The unit completed its 96-hour trial run in April 2024[10].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://news.bjx.com.cn/html/20210827/1173237.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "福鼎热电厂工程扩建项目3号机组通过72+24小时满负荷试运行-北极星火力发电网". news.bjx.com.cn. 2024-04-24. Archived from the original on 2024-05-10. Retrieved 2024-05-09.
- ↑ "福鼎热电厂扩建工程锅炉水压试验一次成功". Archived from the original on 2024-01-25.
- ↑ https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "福建省经济和信息化委员会关于同意福鼎热电厂发电机组并网运行的批复," @Info, 2016年11月22日
- ↑ "福能股份:福鼎热电厂工程扩建项目获得核准," 北极星电力网新闻中心, 2021/8/27
- ↑ "2023 Fujian key projects under construction list". EPT China. 2023-03-06. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福鼎热电厂扩建工程锅炉水压试验一次成功". 福建省国资委. 2023-05-30. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福鼎热电厂工程扩建项目脱硫塔钢烟囱顶层顺利就位". 中国电建福建工程. 2023-09-27. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "龙安热电举行福鼎热电厂工程扩建项目3号机组交接仪式". BJX. 2024-04-24. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.