GCC Trident solar project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
GCC Trident solar project is an operating solar photovoltaic (PV) farm in Gallatin County, Montana, United States.
Project Details
Table 1: Phase-level project details for GCC Trident solar project
Phase name | Status | Commissioning year | Nameplate capacity | Technology |
---|---|---|---|---|
GCC1 | Operating[1] | 2022[1] | 2 MWac[1] | PV[1] |
GCC2 | Construction[1] | – | 2 MWac[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for GCC Trident solar project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
GCC1 | Gallatin County, Montana, United States[1] | 45.9373, -111.4637 (exact)[1] |
GCC2 | Gallatin County, Montana, United States[1] | 45.9373, -111.4637 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References