GCL Fogang Gas Distributed Energy Station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

GCL Fogang Gas Distributed Energy Station (协鑫佛冈燃气分布式能源电站) is a power station in Qingyuan, Fogang County, Guangdong, China with multiple units of varying statuses none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
GCL Fogang Gas Distributed Energy Station Qingyuan, Fogang County, Guangdong, China 23.75672, 113.52094 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 construction[2] gas[3][4] 120[3] combined cycle[4] yes[3][1] 2024[5]
Unit 2 construction[2] gas[3][4] 120[3] combined cycle[4] yes[3][1] 2024[5]
Unit 3 announced[6] gas[6][3] 120[6] combined cycle[6] yes[6] 2024[5]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Fogang GCL Distributed Energy Co., Ltd.[4][3] GCL Energy Technology Co., Ltd. [53.8%]; Guangzhou Economic Technology Development Zone Industrial Development General Company [34.0%]; other [12.2%]
Unit 2 Fogang GCL Distributed Energy Co., Ltd.[4][3] GCL Energy Technology Co., Ltd. [53.8%]; Guangzhou Economic Technology Development Zone Industrial Development General Company [34.0%]; other [12.2%]
Unit 3 Fogang GCL Distributed Energy Co., Ltd.[4][3] GCL Energy Technology Co., Ltd. [53.8%]; Guangzhou Economic Technology Development Zone Industrial Development General Company [34.0%]; other [12.2%]

Background

This project consists of 3 units. The first phase includes Unit 1 and Unit 2, and the construction timeline for Phase I is anticipated to be 2022-2023.[7]

Articles and Resources

References

  1. 1.0 1.1 1.2 (PDF) https://web.archive.org/web/20210604162055/http://www.nuep.com.cn/ueditor/net/upload/2020-04-26/898b39db-de16-4811-a273-029ca95d3a95.pdf. Archived from the original (PDF) on 04 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 http://www.fogang.gov.cn/ywdt/zwdt/content/post_1688375.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://web.archive.org/web/20220407174748/https://news.bjx.com.cn/html/20210223/1137636.shtml. Archived from the original on 07 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://www.qcc.com/firm/10d2c594f63618ce49048ae991457e46.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 (PDF) https://web.archive.org/web/20221003185129/http://www.foshan.gov.cn/fszdxmgzj/attachment/0/247/247515/5210804.pdf. Archived from the original (PDF) on 03 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 (PDF) https://web.archive.org/web/20221003185129/http://www.foshan.gov.cn/fszdxmgzj/attachment/0/247/247515/5210804.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  7. "广东省发展改革委关于下达广东省2022年重点建设项目计划的通知" (PDF). 2022-03-16. Retrieved 2023-10-24.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.