Gabriela Mistral Mine wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Gabriela Mistral Mine wind farm (Parque Eólico Gabriela Mistral Mine) is a cancelled wind farm in Sierra Gorda, Antofagasta, Chile.

Project Details

Table 1: Phase-level project details for Gabriela Mistral Mine wind farm

Status Nameplate capacity Type Owner
Cancelled (inferred June 2022) 40 MW[1] Onshore[1] Corporación Nacional del Cobre de Chile (CODELCO)[2]

Location

Table 2: Phase-level location details for Gabriela Mistral Mine wind farm

Location Coordinates (WGS 84)
Sierra Gorda, Antofagasta, Chile[1] -23.0036, -69.1511 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.codelco.com/codelco-llamara-a-licitacion-para-construir-planta-de-energia-eolica/prontus_codelco/2011-02-19/013031.html. {{cite web}}: Missing or empty |title= (help)
  2. https://www.lainformacion.com/mundo/codelco-construira-una-planta-eolica-para-la-mina-gabriela-mistral-al-norte-del-pais_9bbrvghokjqw0klzqxid72/. {{cite web}}: Missing or empty |title= (help)