Gabriela Mistral Mine wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Gabriela Mistral Mine wind farm (Parque Eólico Gabriela Mistral Mine) is a cancelled wind farm in Sierra Gorda, Antofagasta, Chile.
Project Details
Table 1: Phase-level project details for Gabriela Mistral Mine wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Cancelled (inferred June 2022) | 40 MW[1] | Onshore[1] | Corporación Nacional del Cobre de Chile (CODELCO)[2] |
Location
Table 2: Phase-level location details for Gabriela Mistral Mine wind farm
Location | Coordinates (WGS 84) |
---|---|
Sierra Gorda, Antofagasta, Chile[1] | -23.0036, -69.1511 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.codelco.com/codelco-llamara-a-licitacion-para-construir-planta-de-energia-eolica/prontus_codelco/2011-02-19/013031.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.lainformacion.com/mundo/codelco-construira-una-planta-eolica-para-la-mina-gabriela-mistral-al-norte-del-pais_9bbrvghokjqw0klzqxid72/.
{{cite web}}
: Missing or empty|title=
(help)