Gallegos wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Gallegos wind farm is an announced wind farm in Union County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Gallegos wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Announced[1] 2028 (planned)[1] 190 MW[1] Onshore[2] Triangle Gallegos LP [100%][3]

Location

Table 2: Phase-level location details for Gallegos wind farm

Phase Name Location Coordinates (WGS 84)
1 Union County, New Mexico, United States[1] 36.5933, -103.6140 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  3. ↑ https://web.archive.org/web/20240131094621/https://nawindpower.com/triangle-gallegos-wins-wind-project-bid-in-new-mexico. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)