Gaotouyao Coal Mine (内蒙古北联电能源开发有限责任公司高头窑煤矿) is located in Zhaojun Town, Dalad Banner, Ordos City, Inner Mongolia, China.
Location
The undated satellite photo below shows the coal mine located in Zhaojun Town, Dalad Banner, Ordos City, Inner Mongolia, China.
Coal Mine Background
Gaotouyao Coal Mine is operated by Inner Mongolia Beilian Power and Energy Development Co., Ltd. The construction started in August 2008, with a designed production capacity of 8.00Mt/a, and it was officially put into operation in December 2016. [1]A roof accident occurred and 1 person died on August 24, 2018. [2]On May 8, 2020, another roof accident occurred with 1 death.[3]
Project Details
- Sponsor:Inner Mongolia Beilian Power and Energy Development Co., Ltd
- Parent Company: China Huaneng(77.15%), Guangdong Hengjian Investment Holding Co.(7.75%), National Energy Investment Group(3.54%), Others(11.56%)
- Location: Zhaojun Town, Dalad Banner, Ordos City, Inner Mongolia, China
- GPS Coordinates: 40.019808,109.639961(exact)
- Status: Operating
- Production Capacity: 8Mt/Annual[4]
- Total Resource:1995.63Mt [5]
- Minable Reserves: 766.45Mt[5]
- Coal Type: bituminous (non-caking coal)
- Mine Size: 99.445k㎡
- Mine Type: Underground
- Start Year: December 2016[1]
- Investment: 3228 million RMB[6]
Articles and resources
References
- ↑ 1.0 1.1 "内蒙古北联电能源开发有限责任公司高头窑煤矿安全现状评价报告"内蒙古安邦安全科技有限公司网, August 30, 2019
- ↑ "内蒙古北联电能源开发有限责任公司高头窑煤矿“8·24”顶板事故1起死亡1人"内蒙古煤矿安全监察局网, August 24, 2018
- ↑ "内蒙古北联电能源开发有限责任公司高头窑煤矿“5·8”顶板事故1起死亡1人"内蒙古煤矿安全监察局网, May 8, 2020.
- ↑ "内蒙古高头窑矿区高头窑煤矿及选煤厂项目通过核准"国家能源局网, June 9, 2011
- ↑ 5.0 5.1 "内蒙古北联电能源开发有限责任公司高头窑矿井及选煤厂水土保持设施通过竣工验收"黄河上中游管理局网, January 11, 2013
- ↑ "关于内蒙古北联电能源开发有限责任公司高头窑矿井及选煤厂竣工环境保护验收合格的函"中华人民共和国环境生态部网, April 14, 2014