30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Gecama Hybrid solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Gecama Hybrid solar farm (Planta híbrida solar fotovoltaica Gecama) is a solar photovoltaic (PV) farm in pre-construction in Atalaya del Cañavate, Cuenca, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Gecama Hybrid solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 250 MWac[2] PV[3] Enlight Renewable Energy [100%][3] Generacion Eolica Castilla La Mancha[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Gecama Hybrid solar farm

Phase Name Location Coordinates (WGS 84)
1 Atalaya del Cañavate, Cuenca, Castilla-La Mancha, Spain[2] 39.5197, -2.2420 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.pv-magazine.es/2023/01/03/luz-verde-a-una-fotovoltaica-de-25008-mw-mas-100-mw-de-almacenamiento-para-hibridar-el-mayor-parque-eolico-de-espana/ https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-236, https://www.pv-magazine.es/2023/01/03/luz-verde-a-una-fotovoltaica-de-25008-mw-mas-100-mw-de-almacenamiento-para-hibridar-el-mayor-parque-eolico-de-espana/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 "BOE-B-2023-236 Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Cuenca, por el que se somete al trámite de Información Pública el Estudio de Impacto Ambiental, la Solicitud de Autorización Administrativa Previa, la Solicitud de Autorización Administrativa de Construcción y la Solicitud de Declaración de Utilidad Pública del proyecto de la planta híbrida Gecama". Boletín Oficial del Estado. 2023-01-03. Archived from the original on 2024-03-25. Retrieved 2024-03-15.
  3. 3.0 3.1 https://web.archive.org/web/20240126045114/https://www.pv-magazine.es/2023/01/03/luz-verde-a-una-fotovoltaica-de-25008-mw-mas-100-mw-de-almacenamiento-para-hibridar-el-mayor-parque-eolico-de-espana/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)