Romania-Ukraine Interconnector is a proposed gas pipeline in Romania and Ukraine with two components.[1][2]

Location

The pipeline would run from Gheraesti, Romania to Khotyn, Ukraine.[1][3]

Loading map...

Project details

Gheraesti-Siret

  • Operator: SNTGN Transgaz SA[1]
  • Owner: SNTGN Transgaz SA[1]
  • Parent Company: Transgaz
  • Proposed capacity:
  • Length: 146 km / 90.72 mi[1]
  • Diameter: 700 mm / 28 inches[4]
  • Cost: €125 million (US$142.5 million)[5]
  • Status: Proposed[6]
  • Start Year: 2026[6]
  • ENTSOG 2020 TYNDP Code: TRA-N-596[6]

Siret-Khotyn

  • Operator: Gas Transmission System Operator of Ukraine[7]
  • Owner: Gas Transmission System Operator of Ukraine[7]
  • Parent: JSC "MAHISTRALNI GAZOPROVODY UKRAINY"
  • Proposed capacity:
    • Romania to Ukraine: 5.1 mcm/d[8]
    • Ukraine to Romania: 7.7 mcm/d[8]
  • Diameter: 700 mm / 27 inches[9]
  • Length: 30 km / 18.64 miles[7]
  • Cost: €40 million (US$45.6 million)[10]
  • Status: Proposed[9]
  • Start Year: 2025[7]
  • ENTSOG 2020 TYNDP Code: TRA-N-502[7]

Background

Together with Siret-Khotyn Gas Pipeline, Gheraesti-Siret Gas Pipeline is a part of the Interconnector Romania - Ukraine project.

The pipeline is listed as the Romanian part of the "interconnection between the RO and the UA gas transmission systems" (TRA-N-596, TRA-N-502) in the European Network of Transmission System Operators for Gas (ENTSOG) 2020 Ten Year Network Development Plan. As of that plan's release, it was expected to be commissioned in 2025.[1]

In its 2018-2027 Network development plan, Transgaz stated that construction would begin in 2022, and the pipeline would begin operating in 2025.[11] However, the 2021-2030 iteration of that document stated that construction would begin in 2023, and the pipeline would begin to operate in 2026.[6]

However, there has been no forward progress on plans for the pipeline, which is not featured in ENTSOG's 2022 TYNDP.

Articles and resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 European Network of Transmission System Operators for Gas (November 25, 2020). "TYNDP 2020 Annex A.2 – Project Tables". ENTSOG. Retrieved December 2, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. ↑ European Network of Transmission System Operators for Gas (July 10, 2020). "Current TYNDP : TYNDP 2020 - Annex A" (PDF). ENTSOG. Retrieved August 31, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. ↑ European Network of Transmission System Operators for Gas (October 2020). "TYNDP Transmission Map" (PDF). ENTSOG. Retrieved December 3, 2020.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ European Network of Transmission System Operators for Gas (November 25, 2020). "TYNDP 2020 Annex A.2 – Project Tables". ENTSOG. Retrieved December 2, 2020.{{cite web}}: CS1 maint: url-status (link)
  5. ↑ Ten Year Network Development Plan 2020 - Annex A - Projects Tables, ENTSOG, accessed Dec. 1, 2021
  6. ↑ 6.0 6.1 6.2 6.3 SNTGN TRANSGAZ SA MEDIAŞ (2021). "PLANUL DE DEZVOLTARE A SISTEMULUI NAȚIONAL DE TRANSPORT GAZE NATURALE" (PDF). Tranzgaz. Retrieved August 31, 2021.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ 7.0 7.1 7.2 7.3 7.4 European Network of Transmission System Operators for Gas (July 10, 2020). "Current TYNDP : TYNDP 2020 - Annex A" (PDF). ENTSOG. Retrieved August 31, 2021.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ 8.0 8.1 ОПЕРАТОР ГТС УКРАЇНИ (March 17, 2020). "ПЛАН РОЗВИТКУ ТОВ "ОПЕРАТОР ГТС УКРАЇНИ" 2020 – 2029" (PDF). tsoua.com. Retrieved September 22, 2021.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ 9.0 9.1 Projects Tables, European Network of Transmission System Operators for Gas (ENTSOG), August 13 2020
  10. ↑ Ten Year Network Development Plan 2020 - Annex A - Projects Tables, ENTSOG, accessed Dec. 14, 2021
  11. ↑ SNTGN TRANSGAZ SA MEDIA? (2018). "PLANUL DE DEZVOLTARE A SISTEMULUI NATIONAL DE TRANSPORT GAZE NATURALE 2018-2027" (PDF). Transgaz. Retrieved August 31, 2021.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles