Gold Dust Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Esmeralda 7 Solar Project

Gold Dust Solar is a cancelled solar photovoltaic (PV) farm in Tonopah, Esmeralda County, Nevada, United States.

Project Details

Table 1: Phase-level project details for Gold Dust Solar

Status Nameplate capacity Technology Owner Operator
Cancelled[1] 1500 MWac[2] PV[2] Arevia Power [100%][2] Arevia Power[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Gold Dust Solar

Location Coordinates (WGS 84)
Tonopah, Esmeralda County, Nevada, United States[2] 37.6996, -117.2060 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.blm.gov/press-release/blm-host-virtual-public-meetings-proposed-solar-projects-near-esmeralda-substation https://gephardtdaily.com/local/trump-administration-cancels-massive-nevada-solar-power-project/, https://www.blm.gov/press-release/blm-host-virtual-public-meetings-proposed-solar-projects-near-esmeralda-substation. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 (PDF) https://web.archive.org/web/20240201184514/https://www.blm.gov/sites/blm.gov/files/docs/2021-09/nv-Gold-Dust-Solar-POD-2021.07.28.pdf. Archived from the original (PDF) on 2024-02-01. {{cite web}}: Missing or empty |title= (help)