Gold Dust Solar
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Esmeralda 7 Solar Project
Gold Dust Solar is a cancelled solar photovoltaic (PV) farm in Tonopah, Esmeralda County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Gold Dust Solar
| Status | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|
| Cancelled[1] | 1500 MWac[2] | PV[2] | Arevia Power [100%][2] | Arevia Power[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Gold Dust Solar
| Location | Coordinates (WGS 84) |
|---|---|
| Tonopah, Esmeralda County, Nevada, United States[2] | 37.6996, -117.2060 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.blm.gov/press-release/blm-host-virtual-public-meetings-proposed-solar-projects-near-esmeralda-substation https://gephardtdaily.com/local/trump-administration-cancels-massive-nevada-solar-power-project/, https://www.blm.gov/press-release/blm-host-virtual-public-meetings-proposed-solar-projects-near-esmeralda-substation.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 (PDF) https://web.archive.org/web/20240201184514/https://www.blm.gov/sites/blm.gov/files/docs/2021-09/nv-Gold-Dust-Solar-POD-2021.07.28.pdf. Archived from the original (PDF) on 2024-02-01.
{{cite web}}: Missing or empty|title=(help)
