Golden Hills (California) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Golden Hills II (Phase 2)

Golden Hills (California) wind farm is an operating wind farm in Alameda County, California, United States.

Project Details

Table 1: Phase-level project details for Golden Hills (California) wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2015[1] 86 MW[2] Onshore[2] NextEra Energy Inc [100%][3] NextEra Energy[4]
2 Operating[1] 2017[1] 46 MW[2] Onshore[2] NextEra Energy Inc [100%][5] NextEra Energy[5]

Location

Table 2: Phase-level location details for Golden Hills (California) wind farm

Phase Name Location Coordinates (WGS 84)
1 Alameda County, California, United States[2] 37.7187, -121.6490 (exact)[2]
2 Alameda County, California, United States[2] 37.7464, -121.6160 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. https://web.archive.org/web/20240131094719/https://www.windpowerengineering.com/nextera-energy-partners-announce-acquisition-cedar-bluff-golden-hills-wind-energy-centers/. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131012214/https://www.thewindpower.net/windfarm_en_23709.php. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240131012219/https://newsroom.nexteraenergy.com/som?l=12. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)