Goyder South wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Stony Gap

Goyder South wind farm is a wind farm in pre-construction in Burra, South Australia, Australia.

Project Details

Table 1: Phase-level project details for Goyder South wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
0 Cancelled[1] 109 MW[1] Onshore[1] Palisade Investment Partners LLC; Neoen[2][1] Neoen[1]
1A Construction[3] 2024 (planned)[4] 209 MW[5] Onshore[4] Neoen[2] Neoen[2]
1B Construction[6] 204 MW[5] Onshore[4] Neoen[2] Neoen[2]
2 Pre-construction[6] 2027 (planned)[2] 400 MW[2] Onshore[4] Neoen[2] Neoen[2]
3 Announced[2] 2027 (planned)[2] 400 MW[2] Onshore[4] Neoen[2] Neoen[2]

Location

Table 2: Phase-level location details for Goyder South wind farm

Phase Name Location Coordinates (WGS 84)
0 Burra, South Australia, Australia[1][7] -33.6714, 138.9301 (approximate)[1][7]
1A Burra, South Australia, Australia[7] -33.7442, 138.9809 (approximate)[7]
1B Burra, South Australia, Australia[7] -33.7702645489921, 138.907619840436 (approximate)[6]
2 Burra, South Australia, Australia[7] -33.7442, 138.9809 (approximate)[7]
3 Burra, South Australia, Australia[7] -33.7442, 138.9809 (approximate)[7]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.spglobal.com/marketintelligence/en/news-insights/latest-news-headlines/neoen-submits-plan-for-2-7-gw-hybrid-renewables-project-in-south-australia-60022551. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 "Wind Map of Australia 2021" (PDF). ecogeneration. January 2021. Archived (PDF) from the original on November, 9, 2021. Retrieved June 7, 2021. {{cite web}}: Check date values in: |archive-date= (help)
  3. https://neoen.com/en/news/2023/neoen-completes-financing-for-the-first-209-mw-of-its-goyder-wind-farm-in-south-australia/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://neoen.com/en/news/2022/neoen-gives-go-ahead-on-412-mw-wind-farm-first-stage-of-its-goyder-renewables-zone-in-south-australia/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://www.industry.gov.au/sites/default/files/aip/goyder_wind_farm_1_aipp_draft_summary.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://goyderenergy.com.au/goyder-south/. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 (PDF) https://goyderenergy.com.au/wp-content/uploads/2020/01/Client-Questionnaire-2014.pdf. {{cite web}}: Missing or empty |title= (help)