Gračanica solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: FNE Gracania 2 (Phase 2), FNE Gracania 1 (Phase 1), Bugojno

Gračanica solar farm is a solar photovoltaic (PV) farm in pre-construction in Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina.

Project Details

Table 1: Phase-level project details for Gračanica solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 25 MWp/dc[1] PV[1] Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1]
2 Pre-construction[1] 25 MWp/dc[1] PV[1] Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Gračanica solar farm

Phase Name Location Coordinates (WGS 84)
1 Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] 44.6961, 18.3032 (approximate)[1]
2 Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] 44.6961, 18.3032 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://web.archive.org/web/20240201200509/https://www.pv-magazine.com/2022/07/19/bosnian-utility-to-deploy-50-mw-of-solar-on-coal-waste-site/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)