Gratiot Wind Park

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Gratiot County

Gratiot Wind Park is an operating wind farm in Gratiot County, Michigan, United States.

Project Details

Table 1: Phase-level project details for Gratiot Wind Park

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2011[1] 102 MW[2] Onshore[2] DTE Electric Co [48%]; Invenergy LLC [52%][3] Invenergy[4]
2 Operating[1] 2012[1] 110 MW[2] Onshore[2] DTE Electric Co [48%]; Invenergy LLC [52%][3] Invenergy[4]

Location

Table 2: Phase-level location details for Gratiot Wind Park

Phase Name Location Coordinates (WGS 84)
1 Gratiot County, Michigan, United States[2] 43.3958, -84.4184 (exact)[2]
2 Gratiot County, Michigan, United States[2] 43.4025, -84.5017 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. 3.0 3.1 (PDF) https://newlook.dteenergy.com/wps/wcm/connect/3ea6a6d5-2b03-49cb-851f-27e67e3e9ebb/GratiotCountyWindPark.pdf?MOD=AJPERES https://newlook.dteenergy.com/wps/wcm/connect/3ea6a6d5-2b03-49cb-851f-27e67e3e9ebb/GratiotCountyWindPark.pdf?MOD=AJPERES, https://newlook.dteenergy.com/wps/wcm/connect/3ea6a6d5-2b03-49cb-851f-27e67e3e9ebb/GratiotCountyWindPark.pdf?MOD=AJPERES. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240131012812/https://invenergy.com/news/invenergy-gratiot-announcement. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)