Greenstone Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Greenstone Solar is an operating solar photovoltaic (PV) farm in Branch County, Michigan, United States.
Project Details
Table 1: Phase-level project details for Greenstone Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2023[1] | 20 MWac[1] | PV[2] | Torch Clean Energy [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Greenstone Solar
Location | Coordinates (WGS 84) |
---|---|
Branch County, Michigan, United States[1] | 41.9420, -85.1220 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ https://web.archive.org/web/20240206144844/https://www.thedailyreporter.com/story/business/energy-resource/2023/01/02/100-acre-plus-solar-farm-in-batavia-twp-to-be-completed-by-spring/69757394007/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)