Guangdong Huizhou New Material Industrial Park power station (惠州新材料产业园热电冷联产项目) is a power station in the pre-permit stage in Huizhou, Baihua Town, Huidong County, Guangdong, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guangdong Huizhou New Material Industrial Park power station | Huizhou, Baihua Town, Huidong County, Guangdong, China | 22.903105, 114.612131 (approximate)[1][2][3] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | pre-permit[4][3] | fossil gas - natural gas[5][4][6][3][7] | 460[5] | combined cycle[5] | – | 2025[8] | – |
Unit 2 | pre-permit[4][3] | fossil gas - natural gas[5][4][6][3][7] | 460[5] | combined cycle[5] | – | 2025[8] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 1 | Guangdong Yuedian Huixin Thermal Power Co Ltd [100.0%] |
Unit 2 | Guangdong Yuedian Huixin Thermal Power Co Ltd [100.0%] |
Background
In August 2023, this project received approval from the Huizhou Municipal Energy and Key Projects Bureau.[9] This project is scheduled to commence operation in 2025.[10]
Articles and Resources
References
- ↑ https://landchina.mnr.gov.cn/land/jggg/gpcr1/202210/t20221026_8384312.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240508051321/http://www.hznews.com/focus_news/202401/t20240105_1545465.shtml. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://archive.org/details/screenshot-2023-05-09-at-1.30.53-pm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240427023337/http://drc.gd.gov.cn/snyj/tzgg/content/post_4277335.html. Archived from the original on 27 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20240508051106/https://www.163.com/dy/article/ID1C5E4505198ETO.html. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240508051551/https://m.bjx.com.cn/mnews/20230901/1329435.shtml. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240508051712/https://m.mysteel.com/a/24040115/17D3DC918F6BD785_abc.html. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20230331072543/http://drc.gd.gov.cn/ywtz/content/post_4137123.html. Archived from the original on 31 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "2×460MW!惠州新材料产业园热电冷联产项目获得核准". 2023-09-01. Retrieved 2023-10-25.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "广东省发展改革委关于下达广东省2023年重点建设项目计划的通知". 2023-03-20. Retrieved 2023-10-25.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.