Guangdong Xinhui Daze Gas Thermal power station (新会大泽2×50MW级燃气热电项目, 新会大泽工业园区热电联产项目) is a power station in Daze Town, Xinhui District, Jiangmen, Guangdong, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangdong Xinhui Daze Gas Thermal power station Daze Town, Xinhui District, Jiangmen, Guangdong, China 22.538499256116268, 112.93418090854225 (exact)[1][2]
Loading map...

Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2: 22.538499256116268, 112.93418090854225

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1-1 Construction[2][3] fossil gas: natural gas[4][2][3][5] 50[2] combined cycle[3] yes[3]
1-2 Construction[2][3] fossil gas: natural gas[4][2][3][5] 50[2] combined cycle[3] yes[3]
2 Announced[2] fossil gas: natural gas[2] 50[2] combined cycle[2] yes[2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Guodian Investment (Jiangmen Xinhui) Smart Energy Co Ltd [100%][4][6] China Power International Ltd [100.0%]
1-2 Guodian Investment (Jiangmen Xinhui) Smart Energy Co Ltd [100%][4][6] China Power International Ltd [100.0%]
2 Guodian Investment (Jiangmen Xinhui) Smart Energy Co Ltd [100%][4][6] China Power International Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

This project is planned in two phases. Phase 1 (Unit 1 and Unit 2) officially entered the construction phase on September 30, 2022.[7] The Phase 1 is scheduled for operation in 2024.[8]

Articles and Resources

References

  1. http://www.jiangmen.gov.cn/hdjlpt/yjzj/answer/42739. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 "国家电投新会大泽2×50兆瓦级燃气热电项目首根钢架吊装". 2024-04-01. Archived from the original on 2024-05-07. Retrieved 2024-04-30.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://www.xinhui.gov.cn/jmxhqdzz/gkmlpt/content/2/2707/post_2707745.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20220415213800/https://news.bjx.com.cn/html/20211213/1193316.shtml. Archived from the original on 2022-04-15. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20220708194912/http://www.jiangmen.gov.cn/attachment/0/212/212142/2502172.pdf. Archived from the original (PDF) on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 http://www.xinhui.gov.cn/gzjg/qzfgzbm/jmsxhqfzhggj/tzgg/content/post_2584817.html. {{cite web}}: Missing or empty |title= (help)
  7. "以"新会服务"创造"新会效益"!大泽项目建设开启加速度". 2022-10-01. Retrieved 2023-10-26.{{cite web}}: CS1 maint: url-status (link)
  8. "江门市能源发展十四五规划" (PDF). Retrieved 2023-10-26.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.