Guangdong Yudean Panyu Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guangdong Yudean Panyu Gas power station (广东能源广州番禺气电项目, 广东能源广州气电项目) is a power station in pre-construction in Guangzhou, Shibi Street, Panyu District, Guangdong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangdong Yudean Panyu Gas power station Guangzhou, Shibi Street, Panyu District, Guangdong, China 23.006723, 113.255565 (approximate)[1]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1 Pre-construction[2][3] fossil gas: natural gas[4][2] 460[4][2] combined cycle[2] not found
2 Pre-construction[2][3] fossil gas: natural gas[4][2] 460[4][2] combined cycle[2] not found
3 Pre-construction[2][3] fossil gas: natural gas[4][2] 460[4][2] combined cycle[2] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Guangdong Yuedian Qiming Energy Co Ltd [100%][5][3][2] Guangdong Electric Power Development Co Ltd [100.0%]
2 Guangdong Yuedian Qiming Energy Co Ltd [100%][5][3][2] Guangdong Electric Power Development Co Ltd [100.0%]
3 Guangdong Yuedian Qiming Energy Co Ltd [100%][5][3][2] Guangdong Electric Power Development Co Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Development and Reform Commission of Guangdong Province has proposed to advance this project in the key construction project plan for Guangdong Province in 2023.[6]

Articles and Resources

References

  1. https://archive.org/details/screenshot-2023-05-01-at-1.07.05-pm. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 "天然气发电厂拟选址广佛交界,周边居民提出异议,各方回应". www.163.com. 2023-11-05. Archived from the original on 2024-05-06. Retrieved 2024-04-23.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 "广佛多个大型社区之间建发电厂?番禺区回应:停止选址工作". xapp.southcn.com. 2023-11-18. Archived from the original on 2024-05-09. Retrieved 2024-04-23.
  4. 4.0 4.1 4.2 4.3 4.4 4.5 "广东省2023年重点建设项目计划表" (PDF). Archived from the original (PDF) on 2024-05-06. Retrieved 2024-04-23.
  5. 5.0 5.1 5.2 (PDF) https://www.163.com/dy/article/IIPEK70S05527X1F.html,%20http://drc.gd.gov.cn/attachment/0/516/516342/4137123.pdf. {{cite web}}: Missing or empty |title= (help)
  6. "广东省发展改革委关于下达广东省2023年重点建设项目计划的通知". 2023-03-20. Retrieved 2023-10-26.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.