Guangzhou Nansha LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Guangzhou Nansha LNG Terminal (广州南沙LNG调峰储气库) is a LNG terminal under construction in Nansha, Guangzhou, Guangdong, China. The second phase is proposed.

Location

Loading map...

Project details

Phase 1

  • Owner: Guangdong (Panyu) Petrochemical Storage & Transportation Ltd. 粤海(番禺)石油化工储运开发有限公司[1]
  • Parent company: Guangzhou Development Group Incorporated 广州发展集团股份有限公司
  • Location: Guangzhou, Guangdong, China
  • Coordinates: 22.83969325007859, 113.5601835809603 (exact)
  • Capacity: 1 mtpa, 0.14 bcfd
  • Status: Operating[2]
  • Type: Import
  • Start year:

Phase 2

The second phase of the project received filing certificate in December 2022 from the governmental authority of Guangzhou Nansha Economic Zone.[3] Phase 2 will add two more storage tanks of 160,000 cubic meters each at the reserved land of the LNG terminal. The total investment of second phase is 1.7 billion yuan. The gas storage capacity after the second phase will reach 640,000 cubic meters.[3]

In August 2023, the second phase of the project received environmental impact assessment approval from the authority, one step closer to receiving permit for construction.[4]

  • Owner: Guangdong (Panyu) Petrochemical Storage & Transportation Ltd. 粤海(番禺)石油化工储运开发有限公司[1]
  • Parent company: Guangzhou Development Group Incorporated 广州发展集团股份有限公司
  • Location: Guangzhou, Guangdong, China
  • Coordinates: 22.83969325007859, 113.5601835809603 (exact)
  • Capacity: 1 mtpa [5]
  • Status: Proposed
  • Type: Import
  • Start year:
  • Cost: 1.7 billion RMB

Background

In May 2018, a contract to build the terminal was signed between China Huadian, Guangzhou Port, Guangzhou Nansha Zhenrong Storeage, and Tongton Supply Chain Group.[6][7]

In January 2019, when the first environmental impact assessment was publicised for public participation, the owner of the project has shifted to Guangzhou Gas Group Co., Ltd.[8]

广州LNG应急调峰LNG气源站首船LNG到港接卸.png

The construction of the LNG terminal began in September 30, 2019. It will build two 160,000-cubic-meter storage tanks. The total receiving storage capacity is 1 mtpa.[9] The investment was estimated at 4.38 billion yuan ($666.7 million).[10]

In August 2023, the first cargo was delivered to Phase 1 of the terminal, and it is presumed to be operating.[2][11]

Articles and resources

References

  1. 1.0 1.1 "粤海(番禺)石油化工储运开发有限公司". www.qcc.com.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 "https://lngprime.com/asia/maran-gas-coronis-delivers-first-cargo-to-chinas-nansha-lng-terminal/89113/". {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 "广州发展(600098.SH)拟17.02亿元实施广州LNG应急调峰气源站储气库二期工程 整体储气能力将达64万立方米". finance.sina.com.cn. 2022-12-19.{{cite web}}: CS1 maint: url-status (link)
  4. "关于广州LNG应急调峰储气库二期环境影响报告的批复" (PDF). www.google.com. 2023-08-15.{{cite web}}: CS1 maint: url-status (link)
  5. "广州LNG应急调峰气源站储气库二期工程环境影响公众参与第二次公示-- 广州燃气集团有限公司". www.gzgas.com. 2023-06-07.{{cite web}}: CS1 maint: url-status (link)
  6. Millions of tons of LNG clean energy projects will rise in Nansha Port, CNPGN, May 23, 2018
  7. "一个百万吨级LNG清洁能源项目将在南沙港崛起!". Sohu.com. 2018-05-18.{{cite web}}: CS1 maint: url-status (link)
  8. "广州LNG应急调峰储气库项目环境影响公众参与第一次公示-广州市南沙区人民政府门户网站". www.gzns.gov.cn. 2019-01-04.{{cite web}}: CS1 maint: url-status (link)
  9. "广州LNG规模为100万吨/年应急调峰气源站项目开工-国际燃气网". gas.in-en.com. 2019-10-09. Retrieved 2021-03-29.{{cite web}}: CS1 maint: url-status (link)
  10. "广州液化天然气应急调峰气源站项目落户南沙". gd.ifeng.com. 2018-09-09. Retrieved 2021-03-29.{{cite web}}: CS1 maint: url-status (link)
  11. sina_mobile (2023-08-10). "广州LNG应急调峰气源站首船LNG到港接卸--来源:上海石油天然气交易中心". finance.sina.cn.{{cite web}}: CS1 maint: url-status (link)