Guillena (TotalEnergies) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Postigo, Arbotante, Pilastra, La Noria, La Carrascosa

Guillena (TotalEnergies) solar farm (Complejo solar fotovoltaico Guillena) is a solar photovoltaic (PV) farm under construction in Guillena, Sevilla, Andalucía, Spain.

Project Details

Table 1: Phase-level project details for Guillena (TotalEnergies) solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
Arbotante Construction[1] 2026 (planned)[2] 52 MW[2] PV[2] TotalEnergies SE [100%][3] Arbotante Solar[4]
La Carrascosa Construction[1] 2026 (planned)[2] 55 MW[2] PV[2] TotalEnergies SE [100%][3] TotalEnergies Planta Solar Andalucía 3[4]
La Noria Construction[1] 2026 (planned)[2] 53 MW[2] PV[2] TotalEnergies SE [100%][3] TotalEnergies Planta Solar Andalucía 3[4]
Pilastra Construction[1] 2026 (planned)[2] 52 MW[2] PV[2] TotalEnergies SE [100%][3] Pilastra Solar[4]
Postigo Construction[1] 2026 (planned)[2] 51 MW[2] PV[2] TotalEnergies SE [100%][3] Postigo Solar[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Guillena (TotalEnergies) solar farm

Phase Name Location Coordinates (WGS 84)
Arbotante Guillena, Sevilla, Andalucía, Spain[2] 37.5367, -6.0721 (approximate)[2]
La Carrascosa Guillena, Sevilla, Andalucía, Spain[2] 37.5367, -6.0721 (approximate)[2]
La Noria Guillena, Sevilla, Andalucía, Spain[2] 37.5367, -6.0721 (approximate)[2]
Pilastra Guillena, Sevilla, Andalucía, Spain[2] 37.5367, -6.0721 (approximate)[2]
Postigo Guillena, Sevilla, Andalucía, Spain[2] 37.5367, -6.0721 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-27439, https://www.pv-magazine.es/2023/09/18/totalenergies-construira-cinco-parques-fotovoltaicos-que-suman-mas-de-260-mw-en-guillena/ https://renews.biz/88239/totalenergies-starts-work-on-five-spanish-solar-sites/, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-27439, https://www.pv-magazine.es/2023/09/18/totalenergies-construira-cinco-parques-fotovoltaicos-que-suman-mas-de-260-mw-en-guillena/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 "TotalEnergies construirá cinco parques solares en Guillena (Sevilla)". TotalEnergies. 2023-09-18. Archived from the original on 2024-04-11. Retrieved 2024-04-07.
  3. 3.0 3.1 3.2 3.3 3.4 https://www.pv-magazine.es/2023/09/18/totalenergies-construira-cinco-parques-fotovoltaicos-que-suman-mas-de-260-mw-en-guillena/ https://www.totalenergies.es/es/nuestra-actualidad/totalenergies-construira-cinco-parques-solares-en-guillena-sevilla, https://www.pv-magazine.es/2023/09/18/totalenergies-construira-cinco-parques-fotovoltaicos-que-suman-mas-de-260-mw-en-guillena/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 "BOE-B-2023-27439 Resolución de la Delegación Territorial en Sevilla de Economía, Hacienda y Fondos Europeos, y de Industria Energía y Minas, por el que se concede a favor de la mercantil Almazara Solar, S.L. modificación de autorización administrativa previa y de construcción, así como de la declaración en concreto de utilidad pública para la implantación de las infraestructuras comunes de evacuación de varias plantas solares fotovoltaicas en el término municipal de Guillena (Sevilla)". Boletín Oficial del Estado. 2023-09-23. Archived from the original on 2024-04-11. Retrieved 2024-04-07.