Guizhou Youshan cogen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Guizhou Youshan cogen power station (贵州友山一期2×350MW超超临界燃煤发电项目) is a permitted power station in Chadian Town, Zhijin County, Bijie, Guizhou, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guizhou Youshan cogen power station | Chadian Town, Zhijin County, Bijie, Guizhou, China | 26.885125, 105.735352 (approximate) |
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
Unit 1 | Permitted | coal: unknown | 350 | ultra-supercritical | yes |
Unit 2 | Permitted | coal: unknown | 350 | ultra-supercritical | yes |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Youshan New Materials Technology (Guizhou) Co Ltd | Youshan New Materials Technology (Guizhou) Co Ltd |
Unit 2 | Youshan New Materials Technology (Guizhou) Co Ltd | Youshan New Materials Technology (Guizhou) Co Ltd |
Project-level coal details
- Permit(s): 黔能源审〔2024〕366号
Background
The Guizhou Youshan project, which involves the construction of two 350MW ultra-supercritical coal-fired power units, is progressing through various regulatory stages. Key milestones include the environmental impact assessment (EIA) report's second public notice on December 5, 2024[1], and the Guizhou Provincial Ecological Environment Department is set to review the EIA approval opinions on January 7, 2025[2].
The project received approval from the provincial energy bureau on December 4, 2024 (黔能源审[2024]366 号), and the water and soil conservation plan was licensed by the Guizhou Provincial Water Resources Department on December 31, 2024[3]. The project land use was approved by the Zhijin local government in October 2024[4].
Articles and Resources
References
- ↑ "贵州友山一期2×350MW超超临界燃煤发电项目环境影响报告书环境影响评价第二次公示". 贵州省织金县人民政府网站. 2024-12-05. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "贵州省生态环境厅2025年1月7日拟作出的建设项目环境影响评价文件(报告书)审批意见的公示(贵州友山一期2×350MW超超临界燃煤发电项目)". 贵州省生态环境厅网站. 2025-01-07. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "贵州省水利厅关于贵州友山一期2×350MW超超临界燃煤发电项目水土保持方案的行政许可决定" (PDF). 2024-12-31. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "织金县人民政府关于贵州友山一期2×350MW超超临界燃煤发电项目用地征地补偿安置公告". 贵州省织金县人民政府网站. 2024-10-29. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.