Gujarat (Juniper Green) wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Gujarat (Juniper Green) wind farm is an operating wind farm in Surendra Nagar, Gujarat, India.
Project Details
Table 1: Phase-level project details for Gujarat (Juniper Green) wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Operating[1] | 2024[1] | 70 MW[2] | Onshore[3] | Juniper Green Sigma Pvt Ltd [100%][4] |
Location
Table 2: Phase-level location details for Gujarat (Juniper Green) wind farm
Location | Coordinates (WGS 84) |
---|---|
Surendra Nagar, Gujarat, India[5] | 22.7301, 71.7953 (approximate)[5] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.junipergreenenergy.com/wind-projects.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.junipergreenenergy.com/wind-projects https://www.mercomindia.com/gujarat-approves-lowest-tariff-500-mw-wind-projects, https://www.junipergreenenergy.com/wind-projects.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221025163457/https://www.guvnl.com/notice/UPLOAD/09052022_599GUVNL/599_GUVNL_11_42_33_doc1_Wind%20Rfs%20%28phase%20Iii%29%20Dtd%2009_05_2022.pdf. Archived from the original (PDF) on 25 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126071031/https://www.saurenergy.com/solar-energy-news/lowest-tariff-of-rs-2-84-kwh-discovered-in-guvnl-500-mw-wind-auction. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.suzlon.com/press-release-detail/434/suzlon-secures-second-order-for-their-3-mw-series-turbines-from-juniper-green-energy-private-limited-of-693-mw https://www.saurenergy.com/solar-energy-news/guvnl-seeks-bids-for-500-mw-wind-projects-phase-iii, https://www.suzlon.com/press-release-detail/434/suzlon-secures-second-order-for-their-3-mw-series-turbines-from-juniper-green-energy-private-limited-of-693-mw.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)