Gulei Petrochemical power station (古雷炼化一体化项目自备电厂) is an operating power station of at least 90-megawatts (MW) in Gulei Town, Zhangpu, Zhangzhou, Fujian, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Gulei Petrochemical power station Gulei Town, Zhangpu, Zhangzhou, Fujian, China 23.821626, 117.602719 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3: 23.821626, 117.602719

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Operating coal: unknown 30 unknown 2021
Unit 2 Operating coal: unknown 30 unknown 2022[1]
Unit 3 Operating coal: unknown 30 unknown 2022

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Fujian Gulei Petrochemical Co Ltd [100%] Xuteng Investment [50.0%]; China Petrochemical Corp [25.0%]; Fujian Energy Petrochemical Group Co Ltd [16.1%]; Funeng Fuhua (Pingtan) Equity Investment Partnership LP [4.9%]; Fujian Gulei Petrochemical Equity Investment Partnership LP [4.1%]
Unit 2 Fujian Gulei Petrochemical Co Ltd [100%] Xuteng Investment [50.0%]; China Petrochemical Corp [25.0%]; Fujian Energy Petrochemical Group Co Ltd [16.1%]; Funeng Fuhua (Pingtan) Equity Investment Partnership LP [4.9%]; Fujian Gulei Petrochemical Equity Investment Partnership LP [4.1%]
Unit 3 Fujian Gulei Petrochemical Co Ltd [100%] Xuteng Investment [50.0%]; China Petrochemical Corp [25.0%]; Fujian Energy Petrochemical Group Co Ltd [16.1%]; Funeng Fuhua (Pingtan) Equity Investment Partnership LP [4.9%]; Fujian Gulei Petrochemical Equity Investment Partnership LP [4.1%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In 2021, the power station reportedly brought its first 90 MW unit into grid operation.[2] At the time of reporting (June 2021), a second unit was expected to begin operation later that year.[2]

Articles and Resources

References

  1. "福建漳州古雷炼化一体化项目_北京创新瑞成工程项目管理有限公司". beijingcrc.com. 2022-09-26. Archived from the original on 2024-01-25. Retrieved 2023-10-11.
  2. 2.0 2.1 "古雷炼化一体化项目90兆瓦自备电厂1号发电机组首次发电并网成功," 北极星电力网新闻中心, 2021/6/25