Miluo power station (陕煤汨罗2x100万千瓦燃煤发电工程) is a power station in Baishui Town, Miluo, Yueyang, Hunan, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Miluo power station Baishui Town, Miluo, Yueyang, Hunan, China 28.702573, 113.026012 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase II Unit 3: 28.702573, 113.026012
  • Phase II Unit 4: 28.702942, 113.025996
  • Phase I Unit 1, Phase I Unit 2: 28.702095, 113.026055

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Construction[2] coal: unknown[3][4] 1000[4] ultra-supercritical[5] 2026 (planned) False
Phase I Unit 2 Construction[2] coal: unknown[3] 1000[5] ultra-supercritical[5] 2026 (planned) False
Phase II Unit 3 Shelved[1] coal: unknown[3][4] 1000[4] ultra-supercritical[4] 2026 (planned) False
Phase II Unit 4 Shelved[1] coal: unknown[3] 1000[4] ultra-supercritical[4] 2026 (planned) False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Changan Huazhong Power Generation Co Ltd [100%][4] Changan Huazhong Power Generation Co Ltd [100.0%]
Phase I Unit 2 Changan Huazhong Power Generation Co Ltd [100%][4] Changan Huazhong Power Generation Co Ltd [100.0%]
Phase II Unit 3 Changan Huazhong Power Generation Co Ltd [100%][4] Changan Huazhong Power Generation Co Ltd [100.0%]
Phase II Unit 4 Changan Huazhong Power Generation Co Ltd [100%][4] Changan Huazhong Power Generation Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

In 2014 it was reported that China Guodian (now National Energy Investment Group) was planning to build a two-unit coal-fired power plant with a total capacity of 2,000 MW in Hunan Province.[6][7]

There were no further developments until September 2020, when the project was listed in Hunan Province's 14th Five Year Plan.[8]

In May 2023, it was announced that the project involved two phases, consisting of 2 x 1,000 MW each. The company had already received project approval for Phase I (2 x 1,000 MW) and planned to complete that feasibility study review in early June, complete the project permitting procedure in July, and start construction by the end of the year.[9][10][11]

Phase I Unit 1 had a feasibility study passed in August 2023[12], and the project was approved in November 2023[13]. In January 2024, the project was part of a provincial joint groundbreaking ceremony[14], and an investment cooperation agreement was signed in February[15]. In May, the EIA was accepted for review[16], and the survey and design contract was awarded[17]. In June, the survey and design contract was signed[18]. In September, a tender for main machinery was issued[19], and the contracts were awarded in October-December[20][21].

In February 2025, the supervision contract was awarded[22], and in March, a site preparation tender was issued[23]. In April, piling and auxiliary equipment tenders were issued[24]. By late April, ground was cleared but construction had not started[25]. In May, auxiliary equipment contracts were awarded[26], and the piling contract was awarded later that month[27]. In June, the coal mill contract was awarded[28], and the first concrete was poured on June 28[29]. In August, tenders for the main construction and auxiliary equipment were issued[30][31]. In October, the project started construction[32].

Phase II Units 3 and 4 were shelved in May 2025[33].

Construction of Unit 2 began in December 2025[34].

By May 2026, the boiler beam for Unit 1 was installed, and construction was progressing[35]. In April, the boiler heating surface was welded[36]. In June, the main installation contract was awarded[37].

Ownership

On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[38][39] The merger was completed on November 28, 2017.[40]

In February 2023, it was reported that the project would be carried out by Changan Huazhong Power Generation Co., Ltd..[41]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 "长安电力华中发电有限公司实地考察汨罗火电项目选址点". Weixin Official Accounts Platform. 2023-08-05. Archived from the original on 2024-01-25. Retrieved 2023-10-06.
  2. ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250702/1449104.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 "重大利好!陕煤汨罗2x100万千瓦燃煤发电工程获省发改委核准". www.miluo.gov.cn. 2023-11-16. Archived from the original on 2024-01-25. Retrieved 2023-11-16.
  5. ↑ 5.0 5.1 5.2 "陕煤汨罗2x100万千瓦燃煤发电工程获核准批复-北极星火力发电网". news.bjx.com.cn. 2023-11-16. Archived from the original on 2024-01-25. Retrieved 2023-11-16.
  6. ↑ "国电汨罗电厂300亿项目正在审核备案", 工程机械中国网, 2013-05-28
  7. ↑ "湖南公示大型火电项目优选评议结果 华电平江电厂等上榜", 凤凰网资讯, 2014-07-17
  8. ↑ "投资近220亿!湖南汨罗将建汨罗火电厂、玉池山抽水蓄能电厂," 北极星电力网新闻中心, 2020/9/27
  9. ↑ 2×100万千瓦!汨罗火电项目力争年底开工建设, BJX, 2023-05-29
  10. ↑ 汨罗融媒体 (2023-07-25). "长安电力华中及中南电力设计院来汨罗对接火电项目建设工作". 汨罗人民政府网站. Retrieved 2023-7-27. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. ↑ 岳阳发改 (2023-05-20). "我市召开汨罗火电项目前期工作协调会". 岳阳市政府网站. Retrieved 2023-7-27. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. ↑ "陕煤汨罗2×100万千瓦燃煤发电工程可研通过". 北极星电力网. 2023-08-10. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "陕煤汨罗燃煤发电工程核准批复". 汨罗市人民政府. 2023-11-15. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "陕煤汨罗火电项目集中开工". 微信公众平台. 2024-02-27. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "陕煤汨罗燃煤发电工程投资合作协议签约". 北极星电力网. 2024-03-01. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "陕煤汨罗EIA报告书受理公示". 北极星电力网. 2024-05-09. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "陕煤汨罗勘察设计预中标". 微信公众平台. 2024-05-30. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "中南院签约陕煤汨罗勘察设计合同". 北极星电力网. 2024-06-13. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "陕煤汨罗2×1000MW三大主机招标". 微信公众平台. 2024-09-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "陕煤汨罗三大主机中标公示". 北极星电力网. 2024-10-30. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "哈电中标陕煤汨罗汽轮发电机". 北极星电力网. 2024-12-03. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "陕煤汨罗工程监理服务中标". 微信公众平台. 2025-02-10. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "陕煤汨罗五通一平施工招标". 北极星电力网. 2025-03-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "陕煤汨罗桩基工程施工招标". 北极星电力网. 2025-04-11. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "陕煤汨罗项目场地已清但未开工". 北极星电力网. 2025-05-01. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "陕煤汨罗3项辅机设备采购中标". 北极星电力网. 2025-05-09. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "陕煤汨罗桩基工程施工中标". 北极星电力网. 2025-05-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "北京电力设备总厂中标陕煤汨罗磨煤机". 微信公众平台. 2025-06-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "陕煤汨罗主体第一罐混凝土浇筑". 北极星电力网. 2025-07-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  30. ↑ "陕煤汨罗主体工程招标". 北极星电力网. 2025-08-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "陕煤汨罗第二批辅机招标". 北极星电力网. 2025-08-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "陕煤汨罗项目顺利开工". 微信公众平台. 2025-10-08. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  33. ↑ "陕煤汨罗二期项目搁置". 北极星电力网. 2025-05-01. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  34. ↑ "陕煤汨罗2号锅炉机组开工". 北极星电力网. 2025-12-12. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  35. ↑ "陕煤汨罗项目1号锅炉大板梁就位". 微信公众平台. 2026-05-16. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  36. ↑ "陕煤汨罗1号锅炉受热面开焊". 微信公众平台. 2026-06-04. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  37. ↑ "中电建河南工程中标陕煤汨罗安装C标段". 微信公众平台. 2026-07-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  38. ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
  39. ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
  40. ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
  41. ↑ "投资80亿!汨罗2×1000MW火电项目年内核准动工". 北极星电力网. 2023-02-13. Retrieved 2023-7-27. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)