Harbin Pingnan cogen power station (国能哈尔滨热电厂) is an operating power station of at least 700-megawatts (MW) in Pingxin Town Wangjiawopu, Pingfang, Harbin, Heilongjiang, China with multiple units, some of which are not currently operating. It is also known as 国电哈尔滨热电公司平南热电厂, Guodian Pingnan power station (Unit 1 & 2), 国能黑龙江公司哈热二期2×660MW热电联产, Guoneng Harbin cogen power station (Phase II Unit 3 & 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Harbin Pingnan cogen power station | Pingxin Town Wangjiawopu, Pingfang, Harbin, Heilongjiang, China | 45.54531, 126.65818 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 45.54531, 126.65818
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
Phase II Unit 3 | Construction | coal: unknown | 660 | ultra-supercritical | yes | 2026 (planned) |
Phase II Unit 4 | Construction | coal: unknown | 660 | ultra-supercritical | yes | 2026 (planned) |
Unit 1 | Operating | coal: unknown | 350 | supercritical | yes | 2013 |
Unit 2 | Operating | coal: unknown | 350 | supercritical | yes | 2014 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase II Unit 3 | Guodian Haerbin Thermoelectricity Co Ltd [100%] | China Energy Investment Corp [100.0%] |
Phase II Unit 4 | Guodian Haerbin Thermoelectricity Co Ltd [100%] | China Energy Investment Corp [100.0%] |
Unit 1 | Guodian Haerbin Thermoelectricity Co Ltd [100%] | China Energy Investment Corp [100.0%] |
Unit 2 | Guodian Haerbin Thermoelectricity Co Ltd [100%] | China Energy Investment Corp [100.0%] |
Project-level coal details
- Permit(s): 黑发改电力[2023]89 号
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Unit 1 started operation in 2013 and Unit 2 in 2014. On June 3, 2023, the China Energy Group announced that it would upgrade the Unit 1 turbine and the winning bid was awarded to a consortium led by Beijing Guoneng Longwei Power Technology Co., Ltd. for 60.39 million yuan[1].
The feasibility study for Phase II Units 3 and 4 was approved in August 2023[2], and by October 20, the project received formal approval from the Heilongjiang Provincial Development and Reform Commission[3]. Construction started in October 2024 and is planned for completion by 2026[4].
Articles and Resources
References
- ↑ "国能龙威及山东龙源电力联合体中标国能哈热1号汽轮机通流改造项目". 火电之声. 2024-06-09. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "国能哈热二期2×660MW热电联产扩建项目可研评审会顺利召开". 火电之声. 2023-08-07. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "黑龙江省发展和改革委员会关于国能哈尔滨热电有限公司二期2×660MW 热电联产扩建项目核准的批复". 黑龙江省发展和改革委员网站. 2023-10-20. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "国能哈热二期2×660MW热电联产扩建项目开工". 北极星火力发电网. 2024-10-17. Retrieved 2025-09-18.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.