Harbin Pingnan cogen power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Harbin Pingnan cogen power station (国能哈尔滨热电厂) is an operating power station of at least 700-megawatts (MW) in Pingxin Town Wangjiawopu, Pingfang, Harbin, Heilongjiang, China with multiple units, some of which are not currently operating. It is also known as Guoneng Harbin cogen power station (Phase II Unit 3 & 4), 国能黑龙江公司哈热二期2×660MW热电联产, 国电哈尔滨热电公司平南热电厂, Guodian Pingnan power station (Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Harbin Pingnan cogen power station Pingxin Town Wangjiawopu, Pingfang, Harbin, Heilongjiang, China 45.54531, 126.65818 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 45.54531, 126.65818

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase II Unit 3 Construction[1] coal: unknown[2][3] 660[1] ultra-supercritical[1] yes[1] 2026 (planned)[1] False
Phase II Unit 4 Construction[1] coal: unknown[2][3] 660[1] ultra-supercritical[1] yes[1] 2026 (planned)[1] False
Unit 1 Operating coal: unknown[3] 350 supercritical yes 2013 False
Unit 2 Operating coal: unknown[3] 350 supercritical yes 2014 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase II Unit 3 Guodian Haerbin Thermoelectricity Co Ltd [100%][2] China Energy Investment Corp [100.0%]
Phase II Unit 4 Guodian Haerbin Thermoelectricity Co Ltd [100%][2] China Energy Investment Corp [100.0%]
Unit 1 Guodian Haerbin Thermoelectricity Co Ltd [100%][2] China Energy Investment Corp [100.0%]
Unit 2 Guodian Haerbin Thermoelectricity Co Ltd [100%][2] China Energy Investment Corp [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 黑发改电力[2023]89 号[2], 黑发改电力〔2023〕89号[2]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Unit 1 started operation in 2013 and Unit 2 in 2014. On June 3, 2023, the China Energy Group announced that it would upgrade the Unit 1 turbine and the winning bid was awarded to a consortium led by Beijing Guoneng Longwei Power Technology Co., Ltd. for 60.39 million yuan[4].

The feasibility study for Phase II Units 3 and 4 was approved in August 2023[5], and by October 20, the project received formal approval from the Heilongjiang Provincial Development and Reform Commission[6]. Construction started in October 2024 and is planned for completion by 2026[7].

Boiler steel erection began in January 2025[8], a boiler drum lift was completed in June 2025[9], and the turbine generator foundation was poured in August 2025[10]. The cooling tower was completed in October 2025[11], and various tenders continued into late 2025[12].

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://news.bjx.com.cn/html/20241017/1405661.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://drc.hlj.gov.cn/drc/c111481/202311/c00_31680362.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. "国能龙威及山东龙源电力联合体中标国能哈热1号汽轮机通流改造项目". 火电之声. 2024-06-09. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  5. "国能哈热二期2×660MW热电联产扩建项目可研评审会顺利召开". 火电之声. 2023-08-07. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  6. "黑龙江省发展和改革委员会关于国能哈尔滨热电有限公司二期2×660MW 热电联产扩建项目核准的批复". 黑龙江省发展和改革委员网站. 2023-10-20. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  7. "国能哈热二期2×660MW热电联产扩建项目开工". 北极星火力发电网. 2024-10-17. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)
  8. "哈热二期2×660MW扩建项目3号锅炉首根钢架吊装完成". 电力建设. 2024-11-28. Retrieved 2026-05-27.{{cite web}}: CS1 maint: url-status (link)
  9. "国能哈热二期2×660兆瓦热电联产扩建项目3号机组锅炉大板梁吊装完成". 国家能源集团. 2025-06-23. Retrieved 2026-05-27.{{cite web}}: CS1 maint: url-status (link)
  10. "哈热公司二期扩建项目汽轮发电机基座主体结构顺利浇筑完成". 国家能源集团. 2025-08-26. Retrieved 2026-05-27.{{cite web}}: CS1 maint: url-status (link)
  11. "哈热公司2x660MW热电联产扩建项目3号排烟冷却塔刚性环浇筑顺利封顶". 国家能源集团. 2025-10-22. Retrieved 2026-05-27.{{cite web}}: CS1 maint: url-status (link)
  12. "国家能源集团哈热公司二期2×660MW热电联产扩建项目施工图审查服务中标公示". 北极星电力网. 2025-12-25. Retrieved 2026-05-27.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.