Jiangsu Energy Group Wulagai power station (江苏能源乌拉盖发电厂, 苏能股份锡盟乌拉盖2×1000MW超超临界燃煤发电机组, 江苏能源乌拉盖2x1000MW高效超超临界全国首台百万褐煤发电机组) is an operating power station of at least 2000-megawatts (MW) in Ulgai District, East Ujimqin, Xilingol, Inner Mongolia, China. It is also known as Guodian Mengneng Xilinguole Wulagai Power Plant.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jiangsu Energy Group Wulagai power station Ulgai District, East Ujimqin, Xilingol, Inner Mongolia, China 45.955947, 119.106454 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 45.955947, 119.106454

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[2] coal: lignite[3][4] 1000[3] ultra-supercritical[3] 2025[2] False
Unit 2 Operating[5][6] coal: lignite[3][4] 1000[3] ultra-supercritical[3] 2025[3][6] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Suneng (Xilinguole) Power Generation Co Ltd [100%][3] Jiangsu Xukuang Energy Co Ltd [100.0%]
Unit 2 Suneng (Xilinguole) Power Generation Co Ltd [100%][3] Jiangsu Xukuang Energy Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

China Guodian is planning to build a coal-fired power plant with a total planned capacity of 2,000 MW in Inner Mongolia Autonomous Region. The project feasibility study began in 2011.[7][8][9][10]

2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

2019: Project revived

In December 2019 it was reported that an EIA had been submitted for the project. The plant sponsor was now Jiangsu Energy Investment Group of the Xuzhou Mining Group.[11]

In September 2020, the plant was permitted for construction.[12] The location of the plant has not been determined by the end of 2020, but will be 1.1 kilometers away from the Hesigewula South surface mine, which will also be its integrated coal supplier.[13][11]

2025: Project started operating

Construction began in November 2021.[14]

In 2023, construction progressed[15]. The generator stator for Unit 1 was positioned in October 2023[16].

In May 2024, the generator rotor for Unit 1 was inserted[17]. In August 2024, the boiler hydrostatic test was completed[18]. In November 2024, auxiliary power acceptance was achieved[19].

In September 2025, Unit 1 completed its 168‑hour trial run[20].

In November 2023, the cooling tower structure for Unit 2 was completed[21] and the generator stator was positioned[22].

In May 2024, the chimney inner cylinder for Unit 2 was lifted[23]. In June 2024, the generator rotor was inserted[24]. In July 2024, the turbine bucking was completed[25]. In August 2024, DCS energization was achieved[26].

In April 2025, the boiler hydrostatic test was completed[27]. In August 2025, steam blow for Unit 2 was completed[28].

In October 2025, Unit 2 completed its 168‑hour trial run[29].

Articles and Resources

References

  1. https://news.bjx.com.cn/html/20210115/1129829.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://news.bjx.com.cn/html/20250924/1462647.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 " http://news.bjx.com.cn/html/20191227/1031980.shtml". {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. https://mp.weixin.qq.com/s/gu0kj041pwu4p46he4UWqw. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://news.bjx.com.cn/html/20251031/1467691.shtml. {{cite web}}: Missing or empty |title= (help)
  7. "国电乌拉盖电厂一期工程可研报告通过审查", 内蒙古网群,锡林郭勒,新闻专区,2011-04-27
  8. "自治区发改委同意乌拉盖电厂示范项目开展前期工作", 锡林郭勒盟发展和改革委员会, 2011-05-17
  9. "1—7月份重点项目进展情况", 乌拉盖管理区发展和改革局, 2014-08-11
  10. "国家能源局电力司司长韩水赴乌拉盖调研," 高雪峰, 2015-05-12
  11. 11.0 11.1 "江苏能源乌拉盖2×1000MW超超临界燃煤发电机组工程环评文件第一次公示," 乌拉盖管理区发改委, 2019/12/27
  12. "徐矿集团投资内蒙古项目取得突破," Xinhua Net, 2020年09月14日
  13. 锡林郭勒盟乌拉盖电厂预选址地勘工作启动 12-15-2020, The Paper, 澎湃新闻. 来源:《锡林郭勒日报》
  14. "江苏能源乌拉盖2×100万千瓦电厂项目已开工," 北极星电力网新闻中心, 2021/12/29
  15. "江苏能源乌拉盖2×1000MW燃煤发电项目建设高效率推进". BJX. 2023-06-07. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  16. "苏能乌拉盖2×100万千瓦发电项目1号机组发电机定子顺利吊装就位". WeChat. 2023-10-23. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  17. "苏能(锡)电公司百万褐煤发电工程1号机组发电机转子穿装一次成功". WeChat. 2024-05-06. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  18. "苏能股份锡盟乌拉盖2×1000MW超超临界燃煤发电机组1号锅炉水压试验一次成功". BJX. 2024-08-08. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  19. "江苏能源乌拉盖2×1000兆瓦高效超超临界燃煤发电机组工程项目电气倒送电一次成功". BJX. 2024-12-04. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  20. "江苏能源乌拉盖2×1000兆瓦高效超超临界燃煤发电机组工程1号机组顺利通过168小时满负荷试运行". WeChat. 2025-09-24. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  21. "江苏能源乌拉盖电厂2×1000MW发电工程2号机组间冷塔顺利结顶". WeChat. 2023-11-07. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  22. "苏能(锡)电工程项目2号机组发电机定子顺利吊装就位". BJX. 2023-12-06. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  23. "首台百万褐煤2号烟囱钛钢内筒顺利提升到顶". WeChat. 2024-06-03. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  24. "乌拉盖电厂2号机组发电机转子穿装一次成功". WeChat. 2024-06-10. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  25. "江苏能源乌拉盖2×1000兆瓦高效超超临界燃煤发电项目2号机组汽轮机扣盖圆满完成". BJX. 2024-08-02. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  26. "江苏能源乌拉盖2×1000兆瓦高效超超临界燃煤机组发电工程2号机组DCS受电一次成功". BJX. 2024-08-20. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  27. "江苏能源乌拉盖2×1000MW高效超超临界燃煤发电项目2号锅炉水压试验一次成功". WeChat. 2025-05-13. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  28. "苏能百万项目2号机组点火冲管一次成功". WeChat. 2025-08-15. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)
  29. "江苏徐矿能源乌拉盖2×1000MW超超临界燃煤发电项目2号机组顺利通过168小时试运行". BJX. 2025-10-31. Retrieved 2026-07-21.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.