Guohua Zhoushan power station (神华国华舟山发电公司) is an operating power station of at least 650-megawatts (MW) in Baiquan Town, Dinghai, Zhoushan, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as Shenhua Guohua Zhoushan power station, 国家能源集团舟山电厂三期2×660MW扩建工程 (5 & 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guohua Zhoushan power station Baiquan Town, Dinghai, Zhoushan, Zhejiang, China 30.103996, 122.184817 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 30.103996, 122.184817

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 retired coal - bituminous 125 subcritical 1997 2019
Phase I Unit 2 retired coal - bituminous 135 subcritical 2004 2020
Phase II Unit 3 operating coal - bituminous 300 subcritical 2010
Phase II Unit 4 operating coal - bituminous 350 supercritical 2014
Phase III Unit 5 construction coal - bituminous 660 ultra-supercritical 2024
Phase III Unit 6 construction[1][2] coal - bituminous 660 ultra-supercritical 2024

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]
Phase I Unit 2 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]
Phase II Unit 3 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]
Phase II Unit 4 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]
Phase III Unit 5 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]
Phase III Unit 6 Shenhua Guohua (Zhoushan) Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): January 28, 2022[3], January 28, 2022[3], May 20, 2014, December 2008

Background

Guohua Zhoushan power station has four units, totaling 910 MW. The plant was originally majority-owned by Shenhua Group. The two most recent units (Units 3 and 4) were completed in 2010 and 2014.[4] [5]

Unit 1 was retired in 2019, and unit 2 in 2020.[6][7]

Proposed expansion

In October 2014 Shenhua Group proposed a 2 x 660 MW expansion of the coal plant, with a planned commissioning of 2018.[8]

In 2021, the province listed this project as an "energy security" project in 14th FYP period.[9]

The new phase appeared permitted by February 2022[10] Construction reportedly began in May 2022.[11]

Ownership

On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[12][13] The merger was completed on November 28, 2017.[14]

Articles and Resources

References

  1. https://web.archive.org/web/20240125130642/https://news.bjx.com.cn/html/20231103/1341003.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125130835/https://mp.weixin.qq.com/s/-c6Aho-8hwHGPd90qttPgw. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240125141605/http://zsfgw.zhoushan.gov.cn/art/2022/2/11/art_1297630_58717020.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. "浙江火电中标神华国华舟山电厂二期工程", 中国火力发电网, 2013-02-21
  5. "首台“近零排放”燃煤机组舟山投产", 人民网, 中国能源报, 2014-06-30
  6. 浙江:今年共有27台发电机组被列入淘汰目标(附清单) BJX News, 来源:浙江省发改委, 6/8/2020
  7. "23台机组!浙江省2020年电力行业淘汰落后产能关停名单," 北极星电力网新闻中心, 2021/3/29
  8. "神华国华舟山电厂三期“上大压小”2×660MW燃煤机组扩建工程可行性研究勘察设计招标公告," DLZB, 2014-10-30
  9. "关于火电前期项目优选公示," Zhejiang Provincial Energy, December 30, 2021
  10. 中国浙江省批准浙能六横电厂二期和国能舟山三期煤电项目,总投资129亿元, Reuters, February 9, 2022
  11. 国能浙江舟山电厂三期2台660兆瓦扩建工程开工, BJX, 2022-05-23
  12. "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
  13. "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
  14. "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.