Guoxin Jingjiang Gas Thermal power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guoxin Jingjiang Gas Thermal power station (国信靖江2×100MW级燃机热电联产项目, 国信靖江燃机热电厂) is a cancelled power station in Jingjiang Economic and Technological Development Zone, Taizhou, Jiangsu, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guoxin Jingjiang Gas Thermal power station Jingjiang Economic and Technological Development Zone, Taizhou, Jiangsu, China 31.965117, 120.248897 (exact)[1][2]
Loading map...

Unit-level coordinates (WGS 84):

  • 1, 2: 31.965117, 120.248897

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Equipment Emergency/Backup
1 Cancelled - inferred 4 y[3] fossil gas: natural gas[4] 100[4] combined cycle[4] yes[5][4] GE Vernova: 6F.03, Nanjing Turbine & Electric Machinery (Group): 6F.03[6] no
2 Cancelled - inferred 4 y[3] fossil gas: natural gas[4] 100[5][4] combined cycle[4] yes[4] GE Vernova: 6F.03, Nanjing Turbine & Electric Machinery (Group): 6F.03[6] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%]
2 Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Guoxin Jingjiang Gas Thermal power station (国信靖江燃机热电厂) was approved and granted permission by the Jiangsu Provincial Development and Reform Commission on April 18, 2018. [7]Construction officially commenced on October 29, 2023.[8]

Articles and Resources

References

  1. (PDF) https://fzggw.jiangsu.gov.cn/attach/-1/1806061116567832658.pdf. {{cite web}}: Missing or empty |title= (help)
  2. https://www.qcc.com/firm/d2d6703cc4ff62e1b1ef9d747351ce3b.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "江苏国信(002608)_公司公告_江苏国信:2021年社会责任报告新浪财经_新浪网". vip.stock.finance.sina.com.cn. 2022-04-29. Archived from the original on 2025-07-12. Retrieved 2025-07-07.
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 https://web.archive.org/web/20210604161138/http://fzggw.jiangsu.gov.cn/art/2018/5/25/art_59371_258.html. Archived from the original on 2021-06-04. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 "国信靖江2×100MW级燃机热电联产项目签约_环球能源网". www.shcymc.com. 2021-07-08. Archived from the original on 2026-03-16. Retrieved 2025-07-07.
  6. 6.0 6.1 https://m.bjx.com.cn/mnews/20181210/947753.shtml. {{cite web}}: Missing or empty |title= (help)
  7. "江苏国信靖江2*100MW级燃机热电联产项目". 2018-04-18. Retrieved 2023-11-14.{{cite web}}: CS1 maint: url-status (link)
  8. "国信靖江2×100万千瓦机组扩建项目桩基工程正式开工". 2023-11-03. Retrieved 2023-11-14.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.