Guoxin Jingjiang power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Guoxin Jingjiang power station (江苏国信靖江发电厂, 江苏国信马洲发电有限公司) is an operating power station of at least 3320-megawatts (MW) in Xieqiao, Jingjiang, Taizhou, Jiangsu, China. It is also known as 江苏国信靖江发电有限公司一期项目 (Unit 1 & 2), Yancheng Binhai Port power station, 江苏国信靖江发电有限公司二期项目 (Unit 3 & 4).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Guoxin Jingjiang power station | Xieqiao, Jingjiang, Taizhou, Jiangsu, China | 32.030487, 120.383144 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 32.030487, 120.383144
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: bituminous[1] | 660 | ultra-supercritical | yes | 2013 | False |
| Unit 2 | Operating | coal: bituminous[1] | 660 | ultra-supercritical | yes | 2014 | False |
| Unit 3 | Operating[2][3] | coal: bituminous[1][4] | 1000[4] | ultra-supercritical[3] | – | 2025[3] | False |
| Unit 4 | Operating[5][3] | coal: bituminous[1][3] | 1000[4] | ultra-supercritical[3] | – | 2025[5] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] | Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%] |
| Unit 2 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] | Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%] |
| Unit 3 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] | Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%] |
| Unit 4 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100%][4] | Jiangsu Guoxin Corp Ltd [55.0%]; Shanxi Coal International Energy Group Co Ltd [35.0%]; Jiangsu Huajing Asset Operation Co Ltd [10.0%] |
Project-level coal details
- Coal source(s): imported
- Permit(s): 苏发改能源发〔2023〕715 号[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
Guoxin Jingjiang power station is a two-unit coal-fired power plant with a total capacity of 1,320 MW in Jiangsu Province. Units 1 and 2 began operating in 2013 and 2014, respectively. The plant is owned by Jiangsu Guoxin Investment Group (55%), Shanxi Coal Import & Export Group (35%), and Jiangsu Huajing Asset Management (10%).[6][7]
As of January 2023, an additional two 1,000 MW coal units were proposed.[8] The project's environmental impact assessment was also prepared.[9]
In May 2023, China Energy Construction Jiangsu Institute won the bid for survey and design of Units 3 and 4.[10]
In June 2023, the power station was approved by the Jiangsu Provincial Development and Reform Commission.[11] The power station would soon enter construction preparation.[12]
The project launching ceremony was held on 8 August 2023.[13][14]
The Unit 3 and 4 expansion project progressed significantly from 2024 to 2025. In February 2024, the #3 boiler steel structure was erected[15]. In November 2024, the cooling tower ring beam was poured[16].
Unit 3 successfully passed the 168-hour trial run in December 2025[17].
Unit 4 achieved first grid connection in December 2025[18] and was commissioned by December 30, 2025[19].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ https://news.bjx.com.cn/html/20251212/1474526.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://news.bjx.com.cn/html/20231103/1341008.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://news.bjx.com.cn/html/20230704/1317036.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://news.bjx.com.cn/html/20260104/1477717.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "江苏国信靖江发电有限公司1号机组顺利通过168满负荷试运行", 江苏省国信资产管理集团有限公司, 2013-12-30
- ↑ "国信靖江发电有限公司2号机组顺利通过168小时满负荷试运行", 江苏省国信资产管理集团有限公司, 2014-03-31
- ↑ "关于“先立后改”煤电支撑性电源项目(第二批)规划建设实施方案的公示," Jiangsu, 2023-01-11
- ↑ "江苏国信靖江二期2×1000MW高效清洁燃煤发电扩建项目," news.bjx.com, 2023-04-13
- ↑ "2×1000MW!中国能建江苏院中标江苏国信靖江二期高效清洁燃煤发电扩建项目," news.bjx.com, 2023-05-12
- ↑ "国信靖江2×100万千瓦机组扩建项目获得核准!," news.bjx.com, 2023-07-04
- ↑ "国信靖江百万千瓦机组扩建项目喜获核准," jsgzw.jiangsu.gov, 2023-07-07
- ↑ 江苏省国信集团 (2023-08-10). "国信靖江2×100万千瓦机组扩建项目正式启动". 北极星火力发电网. Retrieved 2023-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国信靖江2×1000MW煤电扩建项目正式启动". 电力项目圈. 2023-08-10. Retrieved 2023-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国信靖江2×100万千瓦机组扩建项目#3锅炉第一根钢架立柱吊装顺利就位". WeChat. 2024-02-20. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信靖江2×100万千瓦机组扩建项目冷却塔环梁顺利浇筑完成". WeChat. 2024-11-09. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信靖江2×100万千瓦机组扩建项目3号机组顺利通过168小时满负荷试运行". WeChat. 2025-12-12. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江苏分公司靖江项目4号机组首次并网一次成功". WeChat. 2025-12-17. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信靖江2×100万千瓦机组扩建项目4号机组投运". WeChat. 2025-12-30. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link)