Gurye Pumped Storage hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Gurye Pumped Storage hydroelectric plant is an announced hydroelectric power plant in Muncheok-myeon, Gurye County, Jeonnam Province, South Korea.
Project Details
Table 1: Project details for Gurye Pumped Storage hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Technology type |
|---|---|---|---|
| Announced[1] | 2034 (planned)[2] | 500 MW[1] | Pumped storage[1] |
Location
Table 2: Location details for Gurye Pumped Storage hydroelectric plant
| Location | Coordinates (WGS 84) |
|---|---|
| Muncheok-myeon, Gurye County, Jeonnam Province, South Korea[3] | 35.1662, 127.4991 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://cm.asiae.co.kr/en/article/2024010210510194481.
{{cite web}}: Missing or empty|title=(help) - ↑ https://cm.asiae.co.kr/en/article/2025122308140550002.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://cm.asiae.co.kr/en/article/2023122909491830440.
{{cite web}}: Missing or empty|title=(help)
