Híjar (Teruel) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Híjar (Teruel) solar farm (Planta fotovoltaica Híjar) is a solar photovoltaic (PV) farm in pre-construction in Híjar, Teruel, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Híjar (Teruel) solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 49.9 MWp/dc[1] PV[1] Alpha 2 Conexión Solar SL [100%][2]
2 Pre-construction[3] 49.8 MWp/dc[3] PV[3] Alpha 3 Solar SL [100%][4]
3 Pre-construction[5] 49.8 MWp/dc[5] PV[5] Alpha 4 Conexión Solar SL [100%][6]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Híjar (Teruel) solar farm

Phase Name Location Coordinates (WGS 84)
1 Híjar, Teruel, Aragón, Spain[7] 41.1905, -0.4318 (approximate)[7]
2 Híjar, Teruel, Aragón, Spain[7] 41.1905, -0.4318 (approximate)[7]
3 Híjar, Teruel, Aragón, Spain[7] 41.1905, -0.4318 (approximate)[7]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.aragon.es/-/planta-fotovoltaica-hijar-i https://www.aragon.es/documents/20127/57256694/CSVWA6YNI65DY1H01PFI+DOB+AAP%2BAC+H%C3%ADjar-1+Escorihuela.pdf/cf9949ba-e730-c407-0a44-e875df5ebfce?t=1688380322248, https://www.aragon.es/-/planta-fotovoltaica-hijar-i. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. "Resolución del Director General de Energía y Minas del Departamento de Industria, Competitividad y Desarrollo Empresarial, por la que se otorga la autorización administrativa previa y autorización de construcción de la planta fotovoltaica "Híjar-1 Escorihuela"". Boletín Oficial de Aragón. 2023-06-21. Archived from the original on 2024-02-19.
  3. 3.0 3.1 3.2 https://www.aragon.es/-/planta-fotovoltaica-hijar-2- https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1284179321010, https://www.aragon.es/-/planta-fotovoltaica-hijar-2-. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. "Resolución de 15 de junio de 2023, del Director General de Energía y Minas del De- partamento de Industria, Competitividad y Desarrollo Empresarial, por la que se otorga la autorización administrativa previa y autorización de construcción de la planta foto- voltaica "Híjar-2 Clavería 1"". Boletín Oficial de Aragón. 2023-06-28. Archived from the original on 2024-02-19.
  5. 5.0 5.1 5.2 https://www.aragon.es/-/planta-fotovoltaica-hijar-3 https://www.aragon.es/documents/20127/88820720/CSVP77LSYT8ES1X01PFI+DOB+AAP%2BAC+H%C3%ADjar-3+Claver%C3%ADa+2.pdf/b9d18293-a616-8b2f-94a8-51f86d9d6b80?t=1688382650216, https://www.aragon.es/-/planta-fotovoltaica-hijar-3. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. "Resolución del Director General de Energía y Minas del Departamento de Industria, Competitividad y Desarrollo Empresarial, por la que se otorga la autorización administrativa previa y autorización de construcción de la planta fotovoltaica "Hijar-3 Claveria 2"". Gobierno de Aragón. 2023-06-23. Archived from the original on 2024-02-19.
  7. 7.0 7.1 7.2 7.3 7.4 7.5 https://www.aragon.es/-/planta-fotovoltaica-hijar-i, https://www.aragon.es/-/planta-fotovoltaica-hijar-2- https://www.aragon.es/-/planta-fotovoltaica-hijar-3, https://www.aragon.es/-/planta-fotovoltaica-hijar-i, https://www.aragon.es/-/planta-fotovoltaica-hijar-2-. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)