HSF La Florida Hive solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

HSF La Florida Hive solar farm (Planta solar fotovoltaica HSF La Florida Hive) is a solar photovoltaic (PV) farm under construction in Dos Hermanas, Sevilla, Andalucía, Spain.

Project Details

Table 1: Phase-level project details for HSF La Florida Hive solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Construction[1] 2026 (planned)[2] 23 MWac[3] PV[3] Encavis AG [100%][4] La Florida Hive[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for HSF La Florida Hive solar farm

Location Coordinates (WGS 84)
Dos Hermanas, Sevilla, Andalucía, Spain[3] 37.2843, -5.9601 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://goldbecksolar.com/en/goldbeck-solar-and-encavis-ag-celebrate-groundbreaking-ceremony-for-30-mwp-la-florida-hive-solar-park-in-dos-hermanas-seville/ https://www.boe.es/diario_boe/txt.php?id=BOE-B-2024-1392, https://goldbecksolar.com/en/goldbeck-solar-and-encavis-ag-celebrate-groundbreaking-ceremony-for-30-mwp-la-florida-hive-solar-park-in-dos-hermanas-seville/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ https://goldbecksolar.com/en/goldbeck-solar-and-encavis-ag-celebrate-groundbreaking-ceremony-for-30-mwp-la-florida-hive-solar-park-in-dos-hermanas-seville/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 "Resolución de 23 de febrero de 2023, de la Delegación Territorial de Economía, Hacienda y Fondos Europeos y de Política Industrial y Energía en Sevilla, por la que se concede a favor de la mercantil La Florida Hive, autorización administrativa previa y autorización administrativa de construcción para la implantación de la instalación que se cita, ubicada en el término municipal de Dos Hermanas (Sevilla)". Junta de Andalucía. 2023-03-27. Archived from the original on 2024-04-15. Retrieved 2024-03-29.
  4. ↑ https://www.pveurope.eu/solar-parks/financing-spain-baywa-re-sells-109-mw-solar-park-encavis https://www.pv-magazine.es/2024/02/26/encavis-adquiere-en-espana-los-proyectos-solares-lirios-de-109-mw-y-la-florida-de-30-mw/, https://www.pveurope.eu/solar-parks/financing-spain-baywa-re-sells-109-mw-solar-park-encavis. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)