Haden solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Haden PV Project, Haden solar power plant
Haden solar farm (محطة حضن للطاقة الشمسية) is a solar photovoltaic (PV) farm under construction in Mecca, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Haden solar farm
| Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|
| Construction[1] | 2027 (planned)[2] | 2000 MW[3] | PV[4] | Saudi Aramco Power Co; Public Investment Fund (Saudi Arabia); ACWA Power Co (صندوق الاستثمارات العامه)[5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Haden solar farm
| Location | Coordinates (WGS 84) |
|---|---|
| Mecca, Saudi Arabia[6] | 21.4166, 41.0763 (approximate)[6] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf, https://www.pv-magazine.com/2024/08/14/chinas-ceec-wins-2-gw-solar-project-in-saudi-arabia/ https://www.acwapower.com/news/ar-ae/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%8C-%D9%88%D8%A8%D8%AF%D9%8A%D9%84-%D9%88%D8%A3%D8%B1%D8%A7%D9%85%D9%83%D9%88-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%AA%D8%AD%D9%82%D9%82-%D8%A7%D9%84%D8%A5%D8%BA%D9%84%D8%A7%D9%82-%D8%A7%D9%84%D9%85%D8%A7%D9%84%D9%8A-%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D9%88%D8%B6%D9%88%D8%A6%D9%8A%D8%A9-%D8%AD%D8%B6%D9%86-%D9%88%D8%A7%D9%84%D9%85%D9%88%D9%8A%D9%87-%D9%88%D8%A7%D9%84%D8%AE%D8%B4%D9%8A%D8%A8%D9%8A/, https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf, https://www.pv-magazine.com/2024/08/14/chinas-ceec-wins-2-gw-solar-project-in-saudi-arabia/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ "China's CEEC wins 2 GW solar project in Saudi Arabia". pv magazine International. 2024-08-14. Archived from the original on 2024-08-23. Retrieved 2024-08-14.
- ↑ (PDF) https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf https://www.pv-tech.org/saudi-arabias-sppc-signs-ppas-for-5-5gw-of-solar-projects/, https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20240724181606/https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf. Archived from the original (PDF) on 2024-07-24.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf, https://www.acwapower.com/news/ar-ae/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%8C-%D9%88%D8%A8%D8%AF%D9%8A%D9%84-%D9%88%D8%A3%D8%B1%D8%A7%D9%85%D9%83%D9%88-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%AA%D8%AD%D9%82%D9%82-%D8%A7%D9%84%D8%A5%D8%BA%D9%84%D8%A7%D9%82-%D8%A7%D9%84%D9%85%D8%A7%D9%84%D9%8A-%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D9%88%D8%B6%D9%88%D8%A6%D9%8A%D8%A9-%D8%AD%D8%B6%D9%86-%D9%88%D8%A7%D9%84%D9%85%D9%88%D9%8A%D9%87-%D9%88%D8%A7%D9%84%D8%AE%D8%B4%D9%8A%D8%A8%D9%8A/ https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf, https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf, https://www.acwapower.com/news/ar-ae/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%8C-%D9%88%D8%A8%D8%AF%D9%8A%D9%84-%D9%88%D8%A3%D8%B1%D8%A7%D9%85%D9%83%D9%88-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%AA%D8%AD%D9%82%D9%82-%D8%A7%D9%84%D8%A5%D8%BA%D9%84%D8%A7%D9%82-%D8%A7%D9%84%D9%85%D8%A7%D9%84%D9%8A-%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D9%88%D8%B6%D9%88%D8%A6%D9%8A%D8%A9-%D8%AD%D8%B6%D9%86-%D9%88%D8%A7%D9%84%D9%85%D9%88%D9%8A%D9%87-%D9%88%D8%A7%D9%84%D8%AE%D8%B4%D9%8A%D8%A8%D9%8A/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 6.0 6.1 (PDF) https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf https://maps.app.goo.gl/Gu4pH6BVmGkmxvxs7, https://www.acwapower.com/media/342188/haden-pv_esia-addendum_v10.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
