Hami-Chongqing UHV Transmission Line power station (哈密至重庆特高压直流工程配套煤电项目) is a power station under construction in Barköl, Hami, Xinjiang, China. It is also known as Shitoumei power station (Unit 1), 新疆重能石头梅电厂 (Unit 1 & 2), 重庆能源哈密2×100万千瓦煤电项目 (Unit 1 & 2), 华电天山绿色能源有限公司2x100万千瓦煤电项目 (Unit 3 &4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hami-Chongqing UHV Transmission Line power station Barköl, Hami, Xinjiang, China 44.3279774, 93.2839317 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 construction coal - unknown 1000 ultra-supercritical
Unit 2 construction coal - unknown 1000 ultra-supercritical
Unit 3 construction coal - unknown 1000 ultra-supercritical
Unit 4 construction coal - unknown 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Xinjiang Zhongneng Power Development Co Ltd [100.0%]
Unit 2 Xinjiang Zhongneng Power Development Co Ltd [100.0%]
Unit 3 Xinjiang Huadian Tianshan Green Energy Co Ltd [100.0%]
Unit 4 Xinjiang Huadian Tianshan Green Energy Co Ltd [100.0%]

Project-level coal details

  • Permit(s): September 7, 2022

Background

This 4 x 1,000 MW ultra-supercritical coal power project will play a peak-shaving role for the Gobi Desert New Energy Base at the northern foot of the Tianshan Mountains and is part of the ‘Xinjiang Electricity to Chongqing’ via the new Hami-Chongqing ±800 kV UHV DC transmission line. In August 2022, the project was seeking it Environmental Impact Assessment permit for part of the project.[1] The project was reportedly granted permission to build in September 2022.[2][3][4]

The project has been split into two 2 x 1000 MW sub-projects and carried out by China Huadian Group with project name Huadian Xinjiang Hami power station (华电新疆哈密2×100万千瓦煤电项目) and Chongqing Energy Investment Group with project name Xinjiang Zhongneng Shitoumei power station (新疆重能石头梅2×100万千瓦煤电项目).[5]

Construction ceremony reportedly took place in September 2022.[4][6][7] Xinjiang Zhongneng Shitoumei power station started ground leveling and cleaning in March 2023.[8] However, concrete was only poured for both power stations on 30 June 2023.[5]

Power Construction Corporation of China won the bid for the construction of Huadian Xinjiang Hami 2 x 1000 MW coal power station.[9] In June 2023, biddings were underway for various EPC tenders related to construction.[10]

China Resources Group is responsible for constructing the Xinjiang Zhongneng Shitoumei power station.[11] Dongfang Electric Corporation is the first candidate to supply boiler, steam turbine, generator, and ESP for Xinjiang Zhongneng Shitoumei power station, while Harbin Electric Co. Ltd. is the second candidate.[12][13]

Articles and Resources

References

  1. 新疆华电哈密“疆电入渝” 2×1000MW煤电项目环境影响评价第一次公众参与公示, BJX, 2022-08-25
  2. "4×1000MW!哈密至重庆特高压直流工程配套煤电项目正式获批". 见道网. 22022-09-14. Retrieved 2023-02-06. {{cite news}}: Check date values in: |date= (help)
  3. 重庆能源 (2022-09-15). "新疆重能石头梅2×100万千瓦煤电项目获批". 北极星电力网. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 重庆日报 (2022-09-29). "哈密至重庆特高压直流工程配套煤电项目开工 系"疆电入渝"工程重要项目,总投资约145亿元". 重庆市人民政府网站. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. 5.0 5.1 "4×1000MW!新疆两大煤电项目同时开工!". 北极星电力网. 2023-07-03. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  6. 疆电入渝”配套煤电项目开建 天山网-新疆日报原创, Sept. 28, 2022
  7. 哈密市融媒体中心 (2022-09-29). ""疆电入渝配套电源""西气东输四线"重大项目开工". 哈密市人民政府网站. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. 重庆能源, 刘洪仪 (2023-04-11). "新疆重能石头梅2×100万千瓦煤电项目场平工程正式开工". 北极星电力网. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. "中国电建中标华电新疆哈密2×100万千瓦煤电项目!". 北极星电力网. 2023-07-25. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. 火电大项目招标!2×1000MW!新疆华电哈密煤电项目相关3项招标, MP Weixin, June 30, 2023
  11. "华润电力4个2×1000MW煤电项目设备监造中标公示". 北极星电力网. 2023-06-07. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. "新疆重能石头梅2×100万千瓦煤电项目三大主机中标公示". 北极星电力网. 2023-03-17. Retrieved 2023-6-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  13. "新疆重能石头梅2×100万千瓦煤电项目三大主机中标公示". 中国电力设备管理网. 2023-04-07. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)