Hami-Chongqing UHV Transmission Line power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Hami-Chongqing UHV Transmission Line power station (新疆天山北麓戈壁能源基地调峰电源, “疆电入渝”哈密至重庆特高压直流工程配套煤电项目) is an operating power station of at least 4000-megawatts (MW) in Barköl, Hami, Xinjiang, China. It is also known as 华电哈密2×100万千瓦煤电项目 (Unit 3 &4), 重庆能源哈密2×100万千瓦煤电项目 (Unit 1 & 2), 华电天山绿色能源有限公司2x100万千瓦煤电项目 (Unit 3 &4), 华润电力重能石头梅电厂 (Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hami-Chongqing UHV Transmission Line power station Barköl, Hami, Xinjiang, China 44.53792, 92.926001 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 44.53792, 92.926001

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[2] coal: unknown[1][3] 1000[1] ultra-supercritical[1] 2025[2] False
Unit 2 Operating[4] coal: unknown[1][3] 1000[1] ultra-supercritical[1] 2025[4] False
Unit 3 Operating[5] coal: unknown[1][3] 1000[1] ultra-supercritical[1] 2025[5] False
Unit 4 Operating[4] coal: unknown[1][3] 1000[1] ultra-supercritical[1] 2025[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Xinjiang Zhongneng Power Development Co Ltd [100%] China Resources Power Holdings Co Ltd [38.2%]; unknown [14.5%]; Chongqing Construction Investment (Group) Co Ltd [8.7%]; Agricultural Bank of China Ltd [7.8%]; China Development Bank Corp [5.8%]; Chongqing LAND PROPERTIES Group Limited Co [4.5%]; Industrial and Commercial Bank of China Ltd [3.0%]; Industrial Bank Co Ltd [2.4%]; Hong Kong Exchanges and Clearing Ltd [1.7%]; China Investment Corp [0.7%]; Bank of Tianjin Co Ltd [0.7%]; Chongqing Yufu Holding Group Co Ltd [0.7%]; The Export-Import Bank of China [0.7%]; Dah Sing Banking Group Ltd [0.3%]; Shandong Luxin Investment Holdings Group Co Ltd [0.3%]; Chongqing International Trust Inc [0.3%]; Ping An Insurance (Group) Company of China Ltd [0.3%]; Chongqing Development Investment Co Ltd [0.2%]; China Life Insurance Co Ltd [0.2%]; SAIC Motor Corp Ltd [0.2%]; Chongqing Water Conservancy Investment (Group) Co Ltd [0.1%]; Ping An Insurance Overseas (Holdings) Co Ltd of China [0.1%]; Wuhan Economic Development Investment (Group) Co Ltd [0.1%]; Legend Holdings Corp [0.1%]; China Baowu Steel Group Co Ltd [0.1%]; CITIC Corporation of China [0.1%]; Shanghai Jianxin Investment Co Ltd [0.0%]; State Grid Corporation of China [0.0%]; Shandong Caixin Asset Operation Co Ltd [0.0%]; Department of Transportation of Jiangxi Province [0.0%]; Shandong Caijin Investment Co Ltd [0.0%]; China Guangfa Bank Co Ltd [0.0%]; Beijing Shenhaihong Investment Consultant Co Ltd [0.0%]; Beijing Jinyinghe Investment Consulting Co Ltd [0.0%]; Shanghai Jingrong Enterprise Management Partnership (General Partnership) [0.0%]; Jilin PROVINCE WANLONG Industry Co Ltd [0.0%]; Beijing Tiandiyuan Investment Management Co Ltd [0.0%]; Zhejiang Ruihe Investment Co Ltd [0.0%]; Jiangxi Financial Investment Group Co Ltd [0.0%]
Unit 2 Xinjiang Zhongneng Power Development Co Ltd [100%][2] China Resources Power Holdings Co Ltd [38.2%]; unknown [14.5%]; Chongqing Construction Investment (Group) Co Ltd [8.7%]; Agricultural Bank of China Ltd [7.8%]; China Development Bank Corp [5.8%]; Chongqing LAND PROPERTIES Group Limited Co [4.5%]; Industrial and Commercial Bank of China Ltd [3.0%]; Industrial Bank Co Ltd [2.4%]; Hong Kong Exchanges and Clearing Ltd [1.7%]; China Investment Corp [0.7%]; Bank of Tianjin Co Ltd [0.7%]; Chongqing Yufu Holding Group Co Ltd [0.7%]; The Export-Import Bank of China [0.7%]; Dah Sing Banking Group Ltd [0.3%]; Shandong Luxin Investment Holdings Group Co Ltd [0.3%]; Chongqing International Trust Inc [0.3%]; Ping An Insurance (Group) Company of China Ltd [0.3%]; Chongqing Development Investment Co Ltd [0.2%]; China Life Insurance Co Ltd [0.2%]; SAIC Motor Corp Ltd [0.2%]; Chongqing Water Conservancy Investment (Group) Co Ltd [0.1%]; Ping An Insurance Overseas (Holdings) Co Ltd of China [0.1%]; Wuhan Economic Development Investment (Group) Co Ltd [0.1%]; Legend Holdings Corp [0.1%]; China Baowu Steel Group Co Ltd [0.1%]; CITIC Corporation of China [0.1%]; Shanghai Jianxin Investment Co Ltd [0.0%]; State Grid Corporation of China [0.0%]; Shandong Caixin Asset Operation Co Ltd [0.0%]; Department of Transportation of Jiangxi Province [0.0%]; Shandong Caijin Investment Co Ltd [0.0%]; China Guangfa Bank Co Ltd [0.0%]; Beijing Shenhaihong Investment Consultant Co Ltd [0.0%]; Beijing Jinyinghe Investment Consulting Co Ltd [0.0%]; Shanghai Jingrong Enterprise Management Partnership (General Partnership) [0.0%]; Jilin PROVINCE WANLONG Industry Co Ltd [0.0%]; Beijing Tiandiyuan Investment Management Co Ltd [0.0%]; Zhejiang Ruihe Investment Co Ltd [0.0%]; Jiangxi Financial Investment Group Co Ltd [0.0%]
Unit 3 Xinjiang Huadian Tianshan Green Energy Co Ltd [100%][4] China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%]
Unit 4 Xinjiang Huadian Tianshan Green Energy Co Ltd [100%][5] China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%]

Project-level coal details

  • Coal source(s): domestic

Background

This 4 x 1,000 MW ultra-supercritical coal power project will play a peak-shaving role for the Gobi Desert New Energy Base at the northern foot of the Tianshan Mountains and is part of the ‘Xinjiang Electricity to Chongqing’ via the new Hami-Chongqing ±800 kV UHV DC transmission line. In August 2022, the project was seeking it Environmental Impact Assessment permit for part of the project.[6] The project was reportedly granted permission to build in September 2022.[7][8][9]

The project has been split into two 2 x 1000 MW sub-projects and carried out by China Huadian Group with project name Huadian Xinjiang Hami power station (华电新疆哈密2×100万千瓦煤电项目) and Chongqing Energy Investment Group with project name Xinjiang Zhongneng Shitoumei power station (新疆重能石头梅2×100万千瓦煤电项目).[10]

Construction ceremony reportedly took place in September 2022.[9][11][12] Xinjiang Zhongneng Shitoumei power station started ground leveling and cleaning in March 2023.[13] However, concrete was only poured for both power stations on 30 June 2023.[10]

Power Construction Corporation of China won the bid for the construction of Huadian Xinjiang Hami 2 x 1000 MW coal power station.[14] In June 2023, biddings were underway for various EPC tenders related to construction.[15]

China Resources Group is responsible for constructing the Xinjiang Zhongneng Shitoumei power station.[16] Dongfang Electric Corporation is the first candidate to supply boiler, steam turbine, generator, and ESP for Xinjiang Zhongneng Shitoumei power station, while Harbin Electric Co. Ltd. is the second candidate.[17][18]

Units 1 & 2

This 2×1000MW project advanced significantly in 2024, with construction milestones including the completion of the chimney structure[19] and boiler water pressure test[20].

In 2025, Unit 1 completed critical commissioning steps including DCS power-on and achieved first grid connection in May 2025[21]. The unit successfully completed the 168-hour trial run in June 2025[22].

Unit 2 progressed alongside Unit 1, with major milestones including the completion of the indirect cooling tower in October 2024[23] and generator rotor installation in February 2025[24].

Unit 2 achieved its first grid connection in August 2025[25] and completed the 168-hour trial run in August 2025[26].

Units 3 & 4

This 2×1000MW project also progressed steadily, with the chimney structure completion in August 2024[27], generator stator installation in September 2024[28], and boiler water pressure test in November 2024[29]. Unit 3 achieved first grid connection in May 2025[30].

Unit 4 achieved first grid connection in August 2025[31] and completed the 168-hour trial run in August 2025[32].

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://www.prcvalve.com/newsDetail/40650-news. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://mp.weixin.qq.com/s/SlAyUEz0I3iIoX5cK0m8_Q. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://news.bjx.com.cn/html/20250814/1455829.shtml. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://news.bjx.com.cn/html/20250613/1446201.shtml. {{cite web}}: Missing or empty |title= (help)
  6. 新疆华电哈密“疆电入渝” 2×1000MW煤电项目环境影响评价第一次公众参与公示, BJX, 2022-08-25
  7. "4×1000MW!哈密至重庆特高压直流工程配套煤电项目正式获批". 见道网. 22022-09-14. Retrieved 2023-02-06. {{cite news}}: Check date values in: |date= (help)
  8. 重庆能源 (2022-09-15). "新疆重能石头梅2×100万千瓦煤电项目获批". 北极星电力网. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. 9.0 9.1 重庆日报 (2022-09-29). "哈密至重庆特高压直流工程配套煤电项目开工 系"疆电入渝"工程重要项目,总投资约145亿元". 重庆市人民政府网站. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. 10.0 10.1 "4×1000MW!新疆两大煤电项目同时开工!". 北极星电力网. 2023-07-03. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. 疆电入渝”配套煤电项目开建 天山网-新疆日报原创, Sept. 28, 2022
  12. 哈密市融媒体中心 (2022-09-29). ""疆电入渝配套电源""西气东输四线"重大项目开工". 哈密市人民政府网站. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  13. 重庆能源, 刘洪仪 (2023-04-11). "新疆重能石头梅2×100万千瓦煤电项目场平工程正式开工". 北极星电力网. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  14. "中国电建中标华电新疆哈密2×100万千瓦煤电项目!". 北极星电力网. 2023-07-25. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  15. 火电大项目招标!2×1000MW!新疆华电哈密煤电项目相关3项招标, MP Weixin, June 30, 2023
  16. "华润电力4个2×1000MW煤电项目设备监造中标公示". 北极星电力网. 2023-06-07. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  17. "新疆重能石头梅2×100万千瓦煤电项目三大主机中标公示". 北极星电力网. 2023-03-17. Retrieved 2023-6-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  18. "新疆重能石头梅2×100万千瓦煤电项目三大主机中标公示". 中国电力设备管理网. 2023-04-07. Retrieved 2023-7-26. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  19. "疆电入渝配套电源新疆华电天山绿能2×100万千瓦煤电项目烟囱结构顺利到顶". 北极星电力网. 2024-08-19. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  20. "疆电入渝配套电源新疆华电哈密2×100万千瓦煤电项目1号锅炉水压试验一次成功". WeChat. 2024-11-30. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  21. "疆电入渝工程首台1000MW高效超超临界煤电机组——华润电力重能新疆公司1号机组首次并网成功". 北极星电力网. 2025-05-19. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  22. "新疆重能石头梅2×1000兆瓦煤电项目1号机组168小时满负荷试运行结束". WeChat. 2025-06-02. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  23. "新疆分公司2×100万千瓦煤电项目2号间冷塔筒壁结构顺利结顶". WeChat. 2024-10-21. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  24. "中国能建建筑集团承建的新疆重能石头梅2×1000兆瓦煤电项目2号机转子一次穿装成功". 北极星电力网. 2025-02-25. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  25. "华润电力重能新疆公司2×100万千瓦煤电项目2号机组首次并网一次成功". 北极星电力网. 2025-08-05. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  26. "新疆天山北麓戈壁能源基地第二批2台100万千瓦煤电机组顺利通过168小时满负荷试运行". 北极星电力网. 2025-08-14. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  27. "疆电入渝配套电源新疆华电天山绿能2×100万千瓦煤电项目烟囱结构顺利到顶". 北极星电力网. 2024-08-19. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  28. "疆电入渝配套电源新疆华电天山绿能2×100万千瓦煤电项目1号发电机定子顺利吊装就位". WeChat. 2024-09-30. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  29. "疆电入渝配套电源新疆华电哈密2×100万千瓦煤电项目1号锅炉水压试验一次成功". WeChat. 2024-11-30. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  30. "新疆华电哈密2×1000MW煤电项目1号机组一次冲转成功". WeChat. 2025-05-23. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  31. "新疆华电哈密2×100万千瓦煤电项目2号机组顺利并网发电". WeChat. 2025-08-02. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)
  32. "新疆天山北麓戈壁能源基地第二批2台100万千瓦煤电机组顺利通过168小时满负荷试运行". WeChat. 2025-08-13. Retrieved 2026-07-28.{{cite web}}: CS1 maint: url-status (link)

Additional data