Hamina LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Hamina LNG Terminal is an operating LNG import terminal in Finland.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Hamina LNG Terminal | Port of Hamina, Hamina, Kymenlaakso, Finland[1] | 60.5183139, 27.1608198 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Hamina LNG Terminal | import[2] | operating[3] | 0.17 mtpa[4] | 0.17 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Hamina LNG Terminal | import[2] | US$109,000,000 (100,000,000 EUR)[5] | US$109,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Hamina LNG Terminal | import[2] | operating[3] | 2014[6] | 2018 (FID)[7] | 2017[6] | 2022[6][6][3] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Hamina LNG Terminal | import[2] | operating[3] | Hamina Energy; Alexela AS; Wärtsilä Oyj[8][8][8] | AVH Grupp AS; Hamina Energy; Wärtsilä Oyj | Hamina LNG[9] |
Background
Hamina LNG Terminal is a liquefied natural gas (LNG) regasification terminal under development in Kymenlaakso Region. It appears to have been first proposed in December 2014.[10]
Construction began in May 2017.[10] The project was built by Hamina LNG Oy, a joint venture of Hamina Energy Ltd, Estonian energy company Alexela, and Finnish technology company Wärtsilä. It was 30% funded through a state grant.[11] As of June 2026, only Alexela and Wärtsilä are listed as owners on the project's official website.[12]
Tender was issued on the project in October 2016.[13] Construction began in June 2017, and was scheduled to be completed in 2020.[14]
As of October 2020, the terminal was expected to begin operations in April 2021.[15]
In August 2021, a press release from the Hamina LNG company announced that commercial operations had been delayed until an as yet unspecified date in 2022.[16]
In April 2022, Hamina LNG said that the terminal would enter commercial operations in October 2022 and that it had already launched plans to increase the terminal's capacity.[17]
In October 2022, Hamina LNG Terminal began commercial operations.[18]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/60%C2%B031'05.9%22N+27%C2%B009'39.0%22E/@60.5183139,27.1582449,548m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d60.5183139!4d27.1608198?entry=ttu&g_ep=EgoyMDI1MDYyNi4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://giignl.org/wp-content/uploads/2024/06/GIIGNL-2024-Annual-Report-1.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://lngprime.com/europe/finlands-hamina-lng-terminal-starts-commercial-ops/63128/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.haminalng.fi/lng-terminal/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://giignl.org/news/hamina-lng-terminal-finland-reaches-financial-close.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 https://www.hydrocarbons-technology.com/projects/hamina-lng-terminal/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://giignl.org/hamina-lng-terminal-in-finland-reaches-financial-close/.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 (PDF) https://giignl.org/wp-content/uploads/2025/06/GIIGNL-Annual-Report-2025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ http://www.haminalng.fi/about-company/.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 "https://www.hydrocarbons-technology.com/projects/hamina-lng-terminal/".
{{cite web}}: External link in(help)CS1 maint: url-status (link)|title= - ↑ Hamina LNG website, accessed May 2022
- ↑ "About Us". Hamina LNG. Retrieved June 16, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ Tender issued for Finland's Hamina LNG terminal, Conferenza GNL website, 10 Oct. 2016.
- ↑ Finland: Hamina LNG terminal construction starts, LNG World News, Jun. 22, 2017
- ↑ Commercial commissioning of Hamina LNG’s terminal approaching, Port of Haminakotka, Oct. 21, 2020
- ↑ Commercial commissioning of the LNG terminal in Hamina will be postponed, Hamina LNG press release, Aug. 23, 2021
- ↑ Sanja Pekic, Hamina LNG terminal in Finland to start operations this year, Offshore Energy, Apr. 12, 2022
- ↑ LNG Prime Staff (2022-10-06). "Finland's Hamina LNG terminal starts commercial ops". LNG Prime. Retrieved 2022-12-13.