Hannibal GP–Ben Sahloun Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Hannibal GP–Ben Sahloun Gas Pipeline is an construction gas pipeline proposed to run in Tunisia.[1]

Location

The pipeline is proposed to run in Tunisia.[1]

Project details

  • Operator:
  • Owner:
  • Parent company:
  • Capacity:
  • Length: 20 km[1]
  • Diameter: 18 in[1]
  • Start year: 2009[3]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "Pipeline Construction". Site Bouchamaoui (in français). Retrieved 2025-08-30.
  2. "References BI - PPL Construction | PDF | Fuel Production | Petroleum". Scribd. Retrieved 2025-09-02.
  3. "References BI - PPL Construction | PDF | Fuel Production | Petroleum". Scribd. Retrieved 2025-09-02.

Additional data

To access additional data, including an interactive map of gas pipelines, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.